Information
-
Location
-
Document No.
-
Audit Title
-
Project Name
-
Conducted on
-
Prepared by
-
Location
-
Personnel present during inspection
General Observations
-
General Observations
-
Hazard Categories
- Fall Protection Inadequate
- Fence Panel missing
- Material - Rubbish on scaffold
- Scaffold 30 day Inspection due
- Scaffold requires modification
- Signage missing
- Slip - Trip Hazard
- Work at Heights unsafe
- Scaffold lap board missing
- Scaffold plank missing
- Scaffold Handrail missing
- Scaffold kick board missing
- Exclusion Zone missing
- Exclusion Zone damaged
- scaffold tie missing
- scaffold brace missing
- Lap boards not secured
- Hop up not in place
- Hop up board removed
- mesh not secured
- Mesh not installed
- Scaffold kick board not secured
- Scaffold access stair not excluded or signage in place
- Scaffold tie inspection
- Handrail inspection
- board inspection
- kick board inspection
- hop up inspection
-
Location
-
Building Levels
- External
- Basement 1
- Ground Floor
- Level 1
- Level 2
- Level 3
- Level 5
- Level 6
- Level 7
- Level 8
- Level 9
- Level 10
- Level 11
- Level 12
- Level 13
- Basement 2
- Basement 3
- North elevation
- South elevation
- East elevation
- West elevation
- north / East corner
- North / West corner
- South / East corner
- South /West corner
-
Applicable Contractor/Trade
- A&T ELECTRICAL
- A1 BEST AIR
- AAMBIANZ
- ADRIATIC CERAMICS
- AUSTRALIAN AIR CONDITIONING SERVICES
- BATTAGLIA RENDERING
- CLASSIC LININGS
- CLASSIC PAINTING
- COMPLETE PLUMBING SOLUTIONS
- CRYSTAL POOLS
- ELEPHANTS FOOT
- ELITE SCAFFOLDING
- FORCE FIRE
- FUGEN
- GEOSEAL
- GRAYS PLUMBING SERVICES
- HANSON PRECAST
- KONE ELEVATORS
- MICOS
- NSW STEEL FIXING
- PLATINUM GLASS
- POLETTI FORMWORK
- PREMIUM DOORS
- PRESTIGE JOINERY
- STRUCTURAL SYSTEMS
- UNIQUE TILE & STONE
- WARD CIVIL
- DELUXE CLEANING
- DJD BRICKLAYING
- TOGA CONSTRUCTIONS
- SYDNEY WIDE RENDER
- CLASSIC TILING
- NORSKA
- AMA ALUMINIUM
- GENERAL CRANES
- BARTON PAINTING
- BRUCE BROS CARPET
- OSTA
-
Rectification Required
- Clean off scaffold
- CLEAN UP ASAP!
- Clean up hazard
- Establish exclusion zone
- Install appropriate Signage
- Install Fall Prevention measures
- Install Fence Panel
- Provide Suitable Access
- Scaffolder to Rectify
- Scaffolder to inspect
- Install lap board
- Install scaffold plank
- Install scaffold handrail
- Secure fence panel
- Install Exclusion zone
- Fix Damaged exclusion zone
- install scaffold tie
- install scaffold brace
- Install tube and tie for mid and hand rail
- Install hop up
- install mesh
- replace scaffold plank
- Secure kick board
- Secure mesh
- Secure lap board
- scaffold ties inspected and in place
- scaffold handrails inspected and in place
- scaffold boards inspected and in place
- scaffold kick boards inspected and in place
- scaffold mesh has been removed in preparation for dismantle
- scaffold hop up inspected and in place
-
Close Out By
-
Additional Comments
-
Sign off by - Signature -
- Adam Battaglia
- Bashir Charbaji
- Bassam Nouredine
- Bachire Fakhri
- Chris Stout
- Darren Knight
- David Saidi
- Garry Worrell
- George Ninos
- Grant Osbourne
- Jinson Chacko
- Mark McDonnell
- Michael Brady
- Michael Stepic
- Murray Gilmour
- Nesbojsa Gulic
- Nedo Nedic
- Phil Hughes
- Rex Nicodemus
- Steve Newcombe
- Tony Nadjovski
- Tyrone Sables
- Zac Duric
- Zvone Jozic
-
Add Media/Photos
10
People present during this inspection - list below
-
HSE Manager
-
Site Manager
-
Project Manager
-
Site Safety Officer
-
Site Safety Committee
-
Foreman
-
Subcontractor 1
-
Subcontractor 2