Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Take a clear photo of RAMS showing job number and address
-
Did sll trades arrive on time
-
Take photo of sign in sheet
-
Did delivery arrive on time
-
Was all stock as per delivery notes
-
Was the delivery note checked and signed
-
Take photo of signed note
-
Take photos of work space before work starts
-
Take photos of any damage to walls or flooring
-
Is all stocked stored safety and correct
-
Take photo of stored stock
-
Was any existing stock used
-
Take photos of any damage to existing stock to be used
-
Has all daily rubbish been removed from work area
-
Take photos of rubbish storage
-
Was all alicated work for the shift completed
-
Take multiple photos of work done during the shift
-
Take photos of any stock damaged during the day
-
Was today the final day of the job
-
If yes take multiple photos of job completion
-
Take photo to show all trades have signed out
-
Project manager sign
-
Customer sign