Title Page
-
Name
-
Location
-
Date
-
Activity:
Tick confirms this has been carried out
-
Has the van been checked to ensure that first aid kit is present and is well stocked?
-
Does the van have suitable spillage matts or granules present in case of fluid spillage?
-
Have all machines being used been checked and serviced as per manufactures recommendations? If machinery not working correctly or damaged please inform manager
-
Have the fuel cans being used been checked for any damage? If fuel can is damaged do not use and inform manager
Tick the boxes which are applicable to the job prior to work starting. Ticking the box ensures you and the team have considered and understand the health and safety considerations associated with the site, the public and machines being used
-
Site Access
-
Signage
-
Welfare
-
Noise
-
Vibration
-
Traffic Management
-
Wildlife
-
Overhead Power lines
-
PPE required
-
Slopes/uneven ground
-
Fuel/Petrol/diesel/oil
-
Manual Handling
-
Herbicides
-
Tree Felling
-
Weather conditions
-
Chainsaws
-
Chipper
-
MEWP
-
Roads/pathways
-
Working near water
-
Tree surgery
-
Pulp stacks
-
Tractors
-
Winches/ropes/cables
-
Fencing and repairs
-
Grass cutting and topping
-
Strimming
-
Ladders and step ladders
-
Painting
-
Non-powered hand tools
-
Stump grinding
-
Litter picking
-
Firewood processing
-
Side arm flail work
-
Record Any Unexpected Hazards & Control Measures Applied, additional to the General Risk Assessment
Emergency Planning
-
Emergency Plan: (Dial 112)
-
What3Words Location
Acknowledged by all workers on site:
-
Signature
-
Date
Acknowledgment of changes to work site should be noted below (to be signed and dated by Supervisor each day of work including any changes to site
-
Changes
-
Signature of Supervisor