Title Page
-
Conducted on
-
Prepared by
-
Location
-
Network Operations - Mechanised ProductionDocument Number: F.212.2.54.026Version: 2.0 Date: 13/11/2018
-
TRACK VEHICLE INSPECTIONInspection Period = Monthly
-
Inspection Date:
-
Person Conducting Inspection:
-
Inspection Location:
-
Responsible Person for Vehicle:
-
OTV: MMA
-
OTV: MMB
Section 1.0 - General
-
Pre-start briefing available and completed correctly?
-
Machine safety signage clearly visible?
-
Safety Glasses
-
Safety Boots
-
Hard Hat
-
Hearing Protection
-
Gloves
-
Overhead Lines
-
Side Reflective Markers
-
Are the isolation points signed an in working order?
-
Is there clear access to all workstations?
-
Are fuels and oils labelled and stored correctly?
-
Is the OTV in a clean, secure, tidy condition inside and out with no loose items?
Section 2.0 - Track Vehicle Requirements
-
Perway protection equipment:
-
2 x Red boards and stands
-
2 x Point clips
-
Emergency breakdown kit:
-
3 x Red triangles
-
Wheel chocks
-
1 x Red, 1 x Yellow, 1 x White, 1 x Green Flag
-
1 x 3 Coloured lens torch
-
1 x Track circuit clip
-
Lookout vest available and in good condition?
-
Are track circuit clips available and in good condition?
-
Rail track signals are in test date? (min of 12) - Note: 5 years past expiry date
-
Rail track signals are stored in a locked container and appropriately signed?
-
Have the portable fire extinguishers been tested and tagged within the last 6 months?
-
Electrical test & tag within test range? (3 Months)
-
Is a current and up to date first aid kit available? (12 Month)
-
Is a current and up to date defibrillator available? (12 Month)
-
Chains and slings test & tag within test date? (12 Months)
-
Are radios (UHF, TCR, VHF) tested and in working condition? (12 Month)
-
All track geometry measuring equipment in good condition, stored appropriately and within calibration date? (12 Months)
-
Emergency spill kits available?
Section 3.0 - Forms & Procedures
-
Track Vehicle Safety Critical Checklists current and completed correctly?
-
Track Vehicle Daily / Weekly Service Checklist current and completed correctly?
-
Has a Rail Corridor Safety Protection Planner (SW01) been completed to enable access to the corridor for the work being performed?
-
Are Safeworking Forms available and current?
-
Aurizon:
-
Rail Corridor Safety Protection Planner (SW01)
-
Work on Track Authority (SW08)
-
Worksite Permit (SW07)
-
Restraining Authority (SW11)
-
Special Safe Working Instruction (SW12)
-
DTC (SW21)
Queensland Rail:
-
Written Authority For Rail Traffic (SW50)
-
Corridor Access Safety Assessment (SW61)
Section 3.1 Forms & Procedures
-
Are Safeworking Forms stored correctly? (i.e. kept on site for 90 days prior to being removed for filing)
-
-
Are Safety Data Sheets (SDS) available for all chemicals?
-
Hot Works Permit current and completed correctly?
-
Safe Work Method Statements Available, up to date and signed by all team members?
-
Standard Operating Procedures (SOP) available and being referenced?
-
Are coupling & towing procedures available?
-
Are route maps available and up to date?
-
Track Vehicle Operators Manual available and current?
-
Are tag out & isolation procedures adhered to?
-
Recommended Tamping Operational and Settings displayed at operators station?
-
Track Geometry Limits for Partially Constructed Track displayed at operators station?
-
Has a critical spares stocktake been completed and submitted in the past 30 days?
-
SPAD, Safeworking Breach Reduction Method (SSRM) form located at drive stations and being used correctly?