Title Page
-
Document No.
-
Audit Title/Job Number
-
Conducted on
-
Prepared by
-
Traffic control contractor
-
Site supervisor
Information
-
Address of TMP risk assessment
-
Date and time of risk assessment
-
Weather at time of risk assessment
- sunny
- overcast
- foggy
- raining
- snowing
- storm
- cloudy
-
Photos of area
-
Photo of the traffic management plan used
Area/PPE
-
Walking surface is well maintained to prevent slips, trips and falls
-
Area available to safely park vehicle/s
-
Correct PPE available for the assessor to carry out risk assessment
-
Signage/vehicle warning lamps correct and working on assessors vehicle
-
Road reserve safe to conduct risk assessment
Road properties
-
Name of primary road
-
Residential, rural or commercial area
-
Vehicles per hour (count for 15 min the x4)
-
Marked with a centre line
-
Road Width
-
Side streets to consider
-
Footpaths avaliable
-
Footpath width
-
Bicycle lane present
-
Width of bicycle lane
-
Can parked cars cause issues within the work site
-
Select actions that have been taken prior to conducting traffic control tasks.
- has a letter drop been conducted
- have parking meters been covered
- have barriers/witches hats been placed over parking areas
-
Is the road clear of overhanging trees and other similar obstructions that may block sight lines to signs or oncoming cars
-
Is there enough room to install signs
-
Good line of sight in all directions to on-coming traffic
Public amenities/services
-
Emergency service providers in vicinity of traffic operations
-
Tick all emergency services in area of works
- ambulance
- fire brigade
- police
- ses
-
Aged or disability care in the vicinity of traffic operations
-
Have the staff been informed of possible problems/delays
-
Schools in the vicinity of traffic operations
-
Checks on time restrictions have been made for that area
-
Bus stops likely to be an issue
-
Has provider been notified in advance
-
How was bus stop managed
-
Are there pedestrian crossings in area
-
How are the pedestrians being managed
Lighting (night works only)
-
Are works likely to extend into night time operations?
-
Lights are in working order and are maintained in a clean state
-
Additional lighting installed and working to safely complete works
Specific location hazards
-
Steep banks/drop offs in the affected area
-
Road is know as a speeding hotspot
-
Heavy haulage route
-
Road is known to carry over dimensional loads
Traffic controller
-
Are the traffic controllers wearing correct PPE?
-
Traffic controller 1 name
-
Can TC provide copy of their qualification?
-
Photo of qualification
-
Traffic controller 2 name
-
Can TC provide copy of their qualification?
-
Photo of qualification
-
Traffic controller 3 name
-
Can TC provide copy of their qualification?
-
Photo of qualification
-
Traffic controller 4 name
-
Can TC provide copy of their qualification?
-
Photo of qualification
-
Traffic controller 5 name
-
Can TC provide copy of their qualification?
-
Photo of qualification
-
Are the traffic controllers qualified and current?
-
Comments on qualifications
-
Is traffic being controlled by a traffic controller?
-
Are the traffic controllers situated in a safe area with escape routes available?
-
What is the speed zone that the traffic controllers are working in?
-
Photos of traffic controllers positioning
Signage
-
Have you completed a drive through of the worksites?
-
Was the sign layout clear and credible and of a standard that drivers could easily understand?
-
Clearly describe the issues with the site
-
Was the signing relevant for the works being undertaken?
-
Have any changes that have been made to the traffic management plan been recorded?
-
How have these changes been doccumented
-
Are all signs in good condition?
-
Photos of affected signs
-
Are signs mounted correctly and securely?
-
Photos of mounting issues
-
Are the signs in position as per the traffic management plan?
General Comments/ Feedback
-
Any other information that is essential for this site?
-
Training Services Tasmania
-
Risk assessor 2
-