Title Page

  • Location
  • undefined

  • Select date

Prelim

  • Date of Prelim

  • LEI Name

  • LEI Phone Number

SITE INFORMATION

  • REC Name

  • REC Phone Number

  • Occupancy Type

  • Site Usage

  • CoES Location

  • Is the site currently "ON SUPPLY"? Not including BTS

  • Is the metering equipment to be altered?

  • Is the service to be upgraded or downgraded?

Metering details

  • Meters Required

  • 501 Quantity

  • 501 Location

  • 504 Quantity

  • 504 Location

  • CT meter quantity required

  • CT meter location

  • Has CT meter been installed

  • Is this an embedded network

  • Is metering located in within a basement?

  • Has conduit been installed for external meetering requirements?

  • Advise REC to contact AMI Strategy engineer for further advice about requirements for clause 8.12 of SIR's Advise REC to contact aminoc@ue.com.au reagrding installation of conduit and comms cable installation

SERVICE CABLE DETAILS

  • Service cable type

  • Origin

  • Pole number

  • Service conductor size

  • Phase required

  • Reticulation type

  • Pole type

  • Conductor lenght

  • Has Service cable been installed?

  • Has dress been complete?

  • What needs to be done and equipment required?

SERVICE FUSE DETAILS

  • Service fuse location

  • Fuse Type

  • Fuse size

  • Quantity Required

TEST AND CONNECT DETAILS

  • Site Maximum Demand Over 100 Amps

  • Agreed rate. (Amps)

  • Has supply capacity been labelled on MSB?

  • Site OK to energise

  • Labelling accurate on meter panels?

  • Locks Required

  • PI Locks

  • 2147

  • Electrical Inspector required?

  • Zinfra Service and Metering crew required? (Can complete jobs up 100A, multiple occupancy's up to 9 on one panel)

  • Zinfra Sub Station Crew/Fitter Required? (If a disconnection is required in substation please tick yes)

  • Zinfra Underground Crew Required? (undergroun service cable, lead in cables to connection facilties)

  • Zinfra Construction Crew Required? (Where reconfiguration of equipment past the service cable is required. Transformer isolator, HV isolation Ect)

  • EPV Required?

  • Access Required?

  • Should Traffic Control be considered?

  • Is a Re-Prelim required?

SERVICING NOTES

  • United Energy/Zinfra Notes. Instructions for United Energy or Zinfra to facilitate the completion of the connection

REC NOTES

  • Any defects?

  • Photos

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.