Title Page
-
Location
-
undefined
-
Select date
Prelim
-
Date of Prelim
-
LEI Name
-
LEI Phone Number
SITE INFORMATION
-
REC Name
-
REC Phone Number
-
Occupancy Type
-
Site Usage
-
CoES Location
-
Is the site currently "ON SUPPLY"? Not including BTS
-
Is the metering equipment to be altered?
-
Is the service to be upgraded or downgraded?
Metering details
-
Meters Required
- 501 Single phase (White) meters
- 502 Single phase(purple) meter
- 503
- 506
- 504 Multiphase (Orange) meters
- CT meter
-
501 Quantity
-
501 Location
-
504 Quantity
-
504 Location
-
CT meter quantity required
-
CT meter location
-
Has CT meter been installed
-
Is this an embedded network
-
Is metering located in within a basement?
-
Has conduit been installed for external meetering requirements?
-
Advise REC to contact AMI Strategy engineer for further advice about requirements for clause 8.12 of SIR's Advise REC to contact aminoc@ue.com.au reagrding installation of conduit and comms cable installation
SERVICE CABLE DETAILS
-
Service cable type
-
Origin
- Pole to pit
- URD pit
- URD pillar
- LV Cabinet
- Kiosk substation
- Pole type substation
- Indoor substation
- Pad mount substation
- Other
-
Pole number
-
Service conductor size
-
Phase required
-
Reticulation type
-
Pole type
-
Conductor lenght
-
Has Service cable been installed?
-
Has dress been complete?
-
What needs to be done and equipment required?
SERVICE FUSE DETAILS
-
Service fuse location
- Panel fuse
- FOLCB
- Krone box
- Weber strip
- Hinged fuse holder
- Fuse switch disconnector (rat trap)
- Load break switch
- Circuit breaker
- in pillar
- on meter panel
- on pole
- at sub
- at msb
-
Fuse Type
-
Fuse size
- 100
- 125
- 160
- 315
- 400
- 600
- other
-
Quantity Required
TEST AND CONNECT DETAILS
-
Site Maximum Demand Over 100 Amps
-
Agreed rate. (Amps)
-
Has supply capacity been labelled on MSB?
-
Site OK to energise
-
Labelling accurate on meter panels?
-
Locks Required
-
PI Locks
-
2147
-
Electrical Inspector required?
-
Zinfra Service and Metering crew required? (Can complete jobs up 100A, multiple occupancy's up to 9 on one panel)
-
Zinfra Sub Station Crew/Fitter Required? (If a disconnection is required in substation please tick yes)
-
Zinfra Underground Crew Required? (undergroun service cable, lead in cables to connection facilties)
-
Zinfra Construction Crew Required? (Where reconfiguration of equipment past the service cable is required. Transformer isolator, HV isolation Ect)
-
EPV Required?
-
Access Required?
-
Should Traffic Control be considered?
-
Is a Re-Prelim required?
SERVICING NOTES
-
United Energy/Zinfra Notes. Instructions for United Energy or Zinfra to facilitate the completion of the connection
REC NOTES
-
Any defects?
-
Photos