Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by Andrew Robertson
-
Location
-
Personnel
Site Information
-
Corridor
-
Work Group
-
Work Type
-
From KM/Signal To KM/Signal Section (Station to Station) Multiple Line Area Single Bi Direction Dual Uni Direction Dual Bi Direction
Personal Protective Equipment (PPE)
-
Are all workers on site wearing PPE including safety vests, safety boots and long/longs
-
Are workers undertaking specialised tasks e.g welding/cutting wearing PPE specific for the task e.g. Spats/welding gloves?
Pre Work Brief (PWB)
-
Has the PWB been completed correctly in accordance with SA-WI-02-010?
-
Have hazards been identified with the appropriate controls put in place?
Worksite Protection Plan (WPP)
-
What type of protection is in place
-
Has the WPP been completed correctly and in accordance with NO-WI-02-010?
-
Is the appropriate protection in place and what type?
-
Has the Diary Log been filled in with appropriate information that includes all dialog including overlapping/adjoining limits?
Certificates of Competency
-
Do all on site contractors have a current RIW card as verified by OnSite track easy?
-
Are all workers competent and qualified to complete the task?
-
Do plant operators have the required competency or High Risk License to operate their item of plant?
Communication
-
Is communication equipment serviceable?
-
Are correct protocols for communication being used?
-
Has a second form of communication been identified?
First Aid
-
Is there a qualified First Aider on site?
-
Are First Aid kits available, in order and in date?
Work Method Statements (WMS)
-
Are WMS available on site?
-
Have all workers signed onto the WMS?
-
Is the WMS relevant to the task?
-
Are the controls being applied?
Plant and Equipment
-
Does all plant meet the ARTC General Plant Requirements EPP-32-03?
-
If the hiab crane is in use: are the stabilising legs/outriggers deployed?
-
If stabilising legs are deployed and the ground surface is soft/unstable, is dunnage in place?
Track vehicles
-
Is the PO aware on track plant and how it is being managed within the work site?
-
If HiRail vehicles are on track, is the dome light operating and are the headlights on?
-
Do all track vehicle on site have the minimum Emergency Safety Equipment on board?
-
Is all the Emergency Safety Equipment properly stored in locked metal boxes?
Fatigue Management
-
Has each person worked 12 hours or less in each shift in this job or project?
-
Have workers been rostered less than four consecutive 12 hour shifts?
-
Have all workers worked less than eight consecutive shifts
-
Have all workers had more than an eight hour break between shifts?
-
Do all workers travel less than an hour to and from work?
Observations
-
Add media