Title Page

  • Job Site

  • Conducted on

  • Prepared by

  • Location

Underground Checklist- Needs to be completed before Backhoe is onsite

  • SDS/ IIPP/ Emergency Information

  • Competent Person

  • Water Proofing Requirements at Drain

  • Signed Contract with Exclusions; Scope of Work

  • Plans with Correct Date

  • Wall Thickness; Drilling Notching OK

  • Approved Submittals

  • For "as-builts" - decide how done before digging

  • Coordinate with Framer especially wood job on riser Location

  • Paint; Protect Risers

  • Any Holidays for Inspectors

  • Tie in@ POC needs inspections

  • Prevailing Wages- on roles responsibilities

  • Water/ Gas etc.

  • Permits in place

  • Layout day before- batter boards up

  • Verify POC- Physical find a sewer manhole

  • Prefabrication Complete

  • Floor drain, floor sinks, floor elevations verified RFI

  • Plan with GC on how to finish concrete

  • Blue Tape for floor drains and sinks

  • Fill Floor Sink with sand

  • All Sleeving and Wrapping issues resolved

  • Manpower requirements scheduled

  • Hours of work

  • Test Air/ Water CO2 bottle with gauges

  • Testing Jim Caps/ Baloneys etc. <br>

  • Trap Primer piping with torch flux etc.

  • Soil report review with PM

  • Restring and Wrap before Sand

  • Sand, Gravel ordered ahead of time

  • Soil to where

  • Verify bench marks to stay after concrete pour; both horizontal and veritcal

  • Shoring Requirement & Ordered

TOOLS

  • Laser, Tripod, Story Pole, Extra Batteries

  • T-Probe

  • String

  • Rebar Stakes 50 Min- Safety Caps

  • Hose for water, fire, garden, fire hose garden adapt hydrant wrench

  • 2 point shovel, 2 flat, 1 bar, 1 pick

  • Whacker with gas can, steel toes, ear plugs or Electric Jack Hammer

  • 100' Tape

  • Single Jack

  • Chain Lock

  • Ladder Size for depth of trench

  • Vests

  • Shoring

  • Field Chalk with Shaker

  • Pins Wrap & WC Wrap or Styrofoam caps

  • Tapped Floor Drains, bap adapt floor sinks

  • Supplied with Drawings, Control Lines, Elevations

  • Site Pictures before digging

  • Picture of all UG pipe before buried & POC

  • Picture of site when done

  • Sharpies/ Keel

  • Gangbox

  • Delineators & Caution Tape

JOURNEYMAN TOOLS REQUIRED

  • Craftsman 8" Fall level (level with grade increments)

  • 30' Tape Measure

  • Single Jack

  • Dikes

  • Channel Locker

  • 100' Tape

  • Notepad & Pen

  • Razor & Knife

  • Cordless Drill & Sawzall with 2 Batteries

  • Torque Wrench with 5/16th

  • Tray & Tool Bags

  • Plumb Bob

  • Crescent 6" & 10"

  • Drill bits for fiberglass basins. Still need

  • Underground Checklist Completed By:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.