Title Page

  • Business Name

  • Location
  • Date of Inspection

  • Inspector

Plans / Drawings

  • The approved plans / drawings are on-site or are available to the contractor.

Visual Inspection

  • Piping, joints, and valves are uncovered.

  • Piping is manufactured in accordance with NFPA 24, Table 10.1.1.1 (Manufacturing Standards for Underground Pipe).

  • Table 10.1.1.1 Manufacturing Standards for Underground Pipe

    Table.PNG
  • Piping is rated for the maximum system working pressure to which the piping will be exposed (not rated less than 150 psi).

  • Depth of piping is sufficient for protection from freeze and mechanical damage.

  • Depth of Piping (minimum 30" from top of the pipe to final grade; minimum of 36" under driveways/roads; minimum of 4' below railroad tracks or under large piles of heavy commodities or subject to heavy shock and vibrations).

  • Direction changes and thrust blocks or restrained joint systems match approved plans.

  • Corrosion resistance, such as coating and wrapping, is installed where necessary.

  • The tightness of bolted joints is verified by bolt torque or other methods approved by the manufacturer.

  • All bolted joint accessories are cleaned and thoroughly coated with asphalt or other corrosion retarding material after installation.

  • Where metal pipes of dissimilar metals are joined, they shall be insulated against the passage of an electric current using an approved method.

  • Bedding and backfill material on-site match the approved plans, do not exceed 3/4" particle size, and contain no ashes, cinders, refuse, organic matter, or other corrosive materials.

  • Backfill material is tamped in layers or in puddles under and around pipes to prevent settlement or lateral movement.

  • Terminates no more than 10’ inside the building.

  • Terminates no more than 1’ above finished floor.

Hydrostatic Test

  • Trench is backfilled between joints.

  • The gauge is located at the lowest elevation or portion of the system being tested.

  • Starting pressure is minimum of 200 psi or 50 psi in excess of the system working pressure, whichever is greater.

  • Pressure pumps disconnected after initial pressurization.

  • The test lasted a minimum of two (2) hours; resulting in less than five (5) psi of pressure loss.

  • The pressure was relieved from the system and the gauge returned to zero (0) psi.

Line Flush

  • Flow through a minimum of 4" hose or pipe.

  • Hose or pipe is restrained prior to flowing water.

  • Observe flush or swab until clear of all debris.

Final Acceptance

  • Control valves are clearly identified and free of obstructions.

  • Operational test of control valves under normal system pressure (does not close in less than 5 seconds when operated at maximum possible speed from the fully open position).

Documentation

  • Contractor's material and test certificate(s) are received.

  • https://www.tdi.texas.gov/forms/sfmfireindustry/sf042sprundergd.pdf

Inspection Status

  • Inspection Status

  • Next Inspection

  • Owner / Representative

  • Phone #

  • Email Address

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.