Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location
  • Project Name:

  • Insert Date and Time of Delivery:

  • Has the site specific induction been completed by the delivery driver?

  • Induction complete?

  • Is the unload team ready to unload the goods?

  • Offload equipment from delivery vehicle

  • Take photos of the area to show obstructions and contact Dornan or Mercury Management team

  • Please take photos of UPS (where applicable) after offloading to show the following: • Tip and tell indicators (where they can be visibly inspected while on the trailer) • Packaging material damage or wet • Rigging Damage • Environmental damage (water heat etc.) • Transportation damage • Handling issues • Tie down features

  • Has a visual inspection of the UPS been performed once the UPS has been offloaded and Photos taken on all sides to show packing condition and tip and tell indicators.

  • Move the UPS to within 1 meter of final position.

  • Please take photos of the equipment in its storage position to show the following: • Tip and Tell Indicators • Drop and Tell Indicators • Packaging material damaged or wet • Cleanliness • Environmental damage (water heat etc) • Transportation damage • Handling issues

  • Eaton representative

  • GC representative

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.