Project Information

  • Document No.

  • Part No.

  • Revision No.

  • Client Name

  • Project Name

  • Inspection Started

  • Prepared by

  • Location

Test Details

  • Drawings Supplied

  • Drawing Number

  • Drawing Revision

  • Drawing Date

  • Drawing Approval RPEQ

  • Specifications Required

  • Pipeline Construction Type

  • Test Method SEQ Code Amendment to WSA02-2002-2.3, Clause 22.4.2.1

    Initial Vacuum Pressure = -27kPa
    Settle Time = 3 Minutes
    Test Vacuum Pressure = -23.60kPa
    Hold Time = As per Table 22.4
    Allowable Loss in Nominated Timeframe = 7kPa

  • Pipelines to be Tested

  • Pipeline
  • Pipeline Identification Details

  • Pipeline Diameter

  • Pipeline Length (m)

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 2 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 3 MINUTES

  • Pipeline Length (m)

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 3 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 5 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 6 MINUTES

  • Consider retesting in shorter lines as this length is outside the Specifications

  • Pipeline Length (m)

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 4 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 5 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 8 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 10 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 13 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 15 MINUTES

  • Consider retesting in shorter lines as this length is outside the Specifications

  • Pipeline Length (m)

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 6 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 9 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 14 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 18 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 23 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 29 MINUTES

  • Consider retesting in shorter lines as this length is outside the Specifications

  • Pipeline Length (m)

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 7 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 14 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 22 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 29 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 36 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 43 MINUTES

  • Consider retesting in shorter lines as this length is outside the Specifications

  • Pipeline Length (m)

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 10 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 21 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 31 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 41 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 52 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 66 MINUTES

  • Consider retesting in shorter lines as this length is outside the Specifications

  • Pipeline Length (m)

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 14 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 28 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 42 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 56 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 70 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 86 MINUTES

  • Consider retesting in shorter lines as this length is outside the Specifications

  • Pipeline Length (m)

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 18 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 37 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 55 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 73 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 92 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 106 MINUTES

  • Consider retesting in shorter lines as this length is outside the Specifications

  • Pipeline Length (m)

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 23 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 46 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 70 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 93 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 116 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 144 MINUTES

  • Consider retesting in shorter lines as this length is outside the Specifications

  • Pipeline Length (m)

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 29 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 57 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 86 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 115 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 143 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 168 MINUTES

  • Consider retesting in shorter lines as this length is outside the Specifications

  • Pipeline Length (m)

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 41 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 83 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 124 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 165 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 207 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 243 MINUTES

  • Consider retesting in shorter lines as this length is outside the Specifications

  • Pipeline Length (m)

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 51 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 102 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 153 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 204 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 255 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 300 MINUTES

  • Consider retesting in shorter lines as this length is outside the Specifications

  • Pipeline Length (m)

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 56 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 112 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 169 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 225 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 281 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 319 MINUTES

  • Consider retesting in shorter lines as this length is outside the Specifications

  • Pipeline Length (m)

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 73 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 147 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 220 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 294 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 367 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 460 MINUTES

  • Consider retesting in shorter lines as this length is outside the Specifications

  • Pipeline Length (m)

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 115 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 230 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 344 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 459 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 574 MINUTES

  • Accept the pipeline under test if the test vacuum loss is =/<7kPa in 700 MINUTES

  • Consider retesting in shorter lines as this length is outside the Specifications

  • Refer to WSA02-2002-2.3 Table 22.4 to extrapolate test hold time

  • Actual Pipeline Diameter

  • Pipeline Length (m)

  • Nominate Extrapolated Hold Time

  • RESULT

  • Test Method SEQ Code Amendment to WSA02-2002-2.3, Clause 22.4.2.2

    Initial Vacuum Pressure = -50kPa
    Settle Time = 3 Minutes
    Test Vacuum Pressure = -45kPa
    Hold Time = 20 minutes
    Allowable Loss in Nominated Timeframe = 2kPa

  • Pipelines to be Tested

  • Pipeline
  • Pipeline Identification Details

  • Pipeline Diameter

  • Pipeline Length (m)

  • RESULT

  • Test Method FNQROC Operational Work Specification Sewerage Reticulation S6, Clause S6.27.9

  • Pipelines to be Tested

  • Pipeline
  • Pipeline Identification Details

  • Pipeline Construction Type

  • Pipeline Diameter

  • Actual Pipeline Diameter

  • Pipeline Length (m)

  • RESULT

  • Enter details of Project Specifications

  • Pipelines to be Tested

  • Pipeline
  • Pipeline Identification Details

  • Pipeline Construction Type

  • Pipeline Diameter

  • Actual Pipeline Diameter

  • Pipeline Length (m)

  • RESULT

Test Procedure

Confirm Project Information

  • Pipelines to be inspected and their details

  • Testing specification requirements

Initial Work Area Inspection

  • Is test area barricaded off or sufficiently delineated?

  • Is traffic control established?

  • Has a Safe Work Method Statement been completed and all control measures followed?

  • Has a Confined Space Risk Assessment & Entry Permit been completed?

  • Is the confined space equipment and procedures set up as per the Risk Assessment & Entry Permit conditions followed?

  • Structure lids removed and placed at a safe distance from the entry point

  • Environmental controls installed as and if required

Inspection Steps

  • Equipment checked and in good working order

  • Insert test plugs into the structure inlets with extendable pole if possible so confined space risks are avoided

  • Inflate plugs and add support as per manufacturer's specifications

  • Attach bypass plug to vacuum pump and vacuum down pipeline to test pressure

  • Allow for vacuum to stabilise for an amount of time as per specifications

  • Hold vacuum for time specified in specifications and record result

Disassemble Steps

  • Disconnect hose from vacuum pump and release pressure from pipeline

  • Release pressure from plugs and carefully retrieve plugs out of structure

  • Replace structure lids, remove barricading and return all items to test unit

Final Demobilisation

  • Notify client of results and to contact TestX office to arrange further testing or reports

  • Calibrated gauge numbers used

  • Inspector's remarks

  • Photo of work area and inspected pipeline

  • I declare that the inspection procedure was followed in accordance with the nominated specifications

  • Inspection Completed

  • Report Issue Date

Report Approval - Cam Reid

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.