Title Page

  • Conducted on

  • Audited By

  • Location
  • Loaded By

  • Truck Arrival Time

  • Delivery #

  • Truck is ready for loading and all dock constraints are in place (include pic of glad hand lock)

  • Trailer # (listed on outside of trailer) - send via email to SEWS CSR

  • Driver log completed and driver signed in correctly

  • Trailer inspected and no damages found prier to loading

  • Loading diagram is available and auditor in a safe place for loading

  • Shipping detail summary trailer # matches actual trailer # (include pic of both)

  • All racks have been pre-counted in the staging area and match the shipping detail summary (circle and initial rack total on diagram - include picture)

  • Scan and take pictures of each stack loaded (clear picture is evidence of serials)

  • Each rack number is checked and initialed for confirmation on the shipping detail summary

  • Load is 100% verified and shipping lanes clear (take pic of shipping lane empty)

  • Rear picture taken of load confirming its safe and loaded correctly

  • BOL's are signed and shipment confirmed completed

  • Loaded and complete time

  • Auditor Signature

  • Forklift Operator Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.