Audit information

Vehicle, Engineer and Equipment Check List

  • Audit month

  • Engineer name

  • Vehicle registration

  • Vehicle make & model

  • Vehicle mileage

  • Location
  • Illious ref:

  • Audit prepared and carried out by

  • Date & time

Section 1 - Vehicle / Water Jetter

VEHICLE

  • 1.1 Van livery displayed with current contact centre number. NRSWA liveried ?

  • 1.2 Vehicle parked safely with consideration for the safety of the general public and persons on site. Site tidy and contained as far as possible ?

  • 1.3 Van clean and tidy - Externally RFL / MOT current

  • 1.4 Van clear and tidy - Internally Segregated clean / dirty areas

  • 1.5 Engineer in MR uniform, ID, CSCS Card, Drivers Licence checked ?

  • 1.6 Engineer utilising correct PPE ?

  • 1.7 Yellow dual beacon operable and visible 360 degrees ?

  • 1.8 Magnetic conspicuous markings available (Highway use only) ? 360 degrees ?

  • 1.9 Hazard diamond labels displayed at rear if appropriate?

  • 1.10 All lights in good working order ?

  • 1.11 Are all tyres in good serviceable condition ?

WATER JETTER

  • 2.1 Water Jetter - Make / Model / Pressure / Flow - Double click here to add notes / image of Jetter

  • 2.2 Jetter condition - pressure safety devices and general condition

  • 2.3 Hose condition - no core visible. Check fix to jet heads and ancillary devices. Check pressure rating ?

  • 2.4 Remote / OMO / condition. Emergency stop fitted and functioning ?

  • 2.5 Jets & Ancillary Equipment

  • 2.6 Standpipe - Check Water Authority Licence

  • 2.7 Has the site been made safe with appropriate signage, lighting and guarding Standpipe

  • 2.8 Is the work being carried out efficiently

Section 2 - EMC / Electrical / CCTV equipment

EMC & ELECTRICAL EQUIPMENT

  • 3.1 EMC, Hand held - Make / Model / Battery / Power

  • 3.2 EMC, Medium - Make / Model / Power

  • 3.3 EMC, Stand Alone - Make / Model / Battery / Power

  • 3.4 Transformer / extension leads / 110v / 240v

  • 3.5 Wet Vac 15 - 20 litres

  • 3.6 Power Drill 110v / Battery

  • 3.7 Angle Grinder 110v

  • 3.8 Portable Appliance Testing (PAT) in date

CCTV EQUIPMENT

  • 4.1 CCTV - Make / Model / Capabilities

  • 4.2 Power generator

  • 4.3 Van fitted inverter

Section 3 - Hand tools / Signs / Safety equipment

SITE & HAND TOOLS inc SAFETY SIGNS

  • 5.1 Are there adequate small tools available - ie manhole keys etc for the work being undertaken and fit for purpose

  • 5.2 Are there adequate safety signs for the work being undertaken - eg jetting / open manhole / barriers

  • 5.3 Kenetic Ram or equivalent

  • 5.4 Drain Rods

  • 5.5 First Aid kit - in date

  • 5.6 Fire Extinguisher - in date

  • 5.7 Hand Wash / Hygiene facility on board

SAFETY EQUIPMENT

  • 6.1 Gas monitors - in calibration

  • 6.2 Tripod / Escape set

  • 6.3 Drain tracer / Sonde

  • 6.4 Heavy duty manhole cover lifter - Hydraulic / Magnetic / Manual

  • 6.5 Liquids - COSHH & Diesel - Bunded

  • 6.6 Spill kits - present

Section 4 - Personal Protective Equipment (PPE)

PERSONAL PROTECTIVE EQUIPMENT (PPE)

  • 8.1 Overalls - blue / polycotton - including spare set

  • 8.2 Safety Helmet - Full size - EN397

  • 8.3 Goggles - EN166

  • 8.4 Visor - EN166

  • 8.5 Ear defenders - Cup type - EN352

  • 8.6 Boots - Steel toe cap

  • 8.7 Wellington boots - Steel toe cap

  • 8.8 Gloves - 24" - Arm length

  • 8.9 Gloves / Gauntlet PVC granular armoured

  • 8.10 Gloves - Medical

  • 8.11 High visibility coat - EN471

  • 8.12 High visibility waist coat

  • 8.13 Wet suit - EN343

  • 8.14 Safety torch

  • 8.15 Safety harness

Section 5 - H&S awareness / Training certification

H&S AWARENESS

  • 10.1 Does the engineer understand his responsibilities regarding Health & Safety

  • 10.2 Does the engineer demonstrate a good understand of Health & Safety procedures and current regulations

  • What was the last Tool Box Talk delivered to the engineer

  • 10.4 Has the engineer seen copies of safety bulletins

  • 10.5 Was the engineer observed working safely and judged to be competent at their job tasks

CERTIFICATION / DOCUMENTATION

  • 9.1 Risk assessments / Method statements

  • 9.2 Engineer training certificates - High Pressure Water Jetting / Confined Space / NRSWA / CSCS

  • 9.3 Engineer cards - WJA hazard / Lepto / Casualty

  • 9.4 PUWER - maintenance records for vehicle and jetter

  • 9.5 Waste transfer records

Section 6 - Site communications / Summary / Sign-off

CLIENT COMMUNICATIONS

  • 11.1 Did the engineer give advice on how to prevent further blockages

  • 11.2 Has the engineer made further recommendations based on his findings

  • 11.3 Has the engineer explained any guarantee

SUMMARY, FINDINGS & COMMENTS

  • Engineers comments:

  • Auditors comments:

SIGN OFF - acceptance of the summary, findings & comments

  • Engineer signature

  • Franchisee signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.