Information

  • Client Name

  • Job Address
  • NAP/PTW Number

  • Shutplan Number

  • Conducted on

  • Prepared by

Start Card

  • Which SHEWMS apply to the work being performed?

  • Are there any site specific hazards that aren't captured in the SHEWMS?

  • List the hazards and the controls you have applied.

  • What controls have been put in place to manage the weather?

  • Are any valves located in the road, or any other trafficable area?

  • What traffic management is being used?

  • STOP work until traffic control is in place. Notify your supervisor if controls are unsuitable or unavailable.

  • Are the controls suitable for the works being performed?

  • STOP work until suitable traffic control is in place. Notify your supervisor if suitable controls are unavailable.

  • Has an emergency assembly point been established and communicated?

  • Describe, draw or photograph the assembly point.

  • Add drawing

  • Add media

  • Sign on
  • By signing, you confirm you have read and agree to all of the above.

  • Nominate an assembly point before beginning works.

  • Start travel

  • Start on-site

  • Finish on-site

  • Finish travel

  • Water off

  • Water on

  • Was there more than one shift on this job?

  • Start travel

  • Start on-site

  • Finish on-site

  • Finish travel

  • Client representative sign-off

  • Operator sign-off

  • Comments

  • Additional Photos

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.