Information
-
Client Name
-
Job Address
-
NAP/PTW Number
-
Shutplan Number
-
Conducted on
-
Prepared by
Start Card
-
Which SHEWMS apply to the work being performed?
- Valve Ops
- Live Traffic
- Confined Space Entry
- Working at Height
-
Are there any site specific hazards that aren't captured in the SHEWMS?
-
List the hazards and the controls you have applied.
-
-
What controls have been put in place to manage the weather?
-
Are any valves located in the road, or any other trafficable area?
-
What traffic management is being used?
-
STOP work until traffic control is in place. Notify your supervisor if controls are unsuitable or unavailable.
-
Are the controls suitable for the works being performed?
-
STOP work until suitable traffic control is in place. Notify your supervisor if suitable controls are unavailable.
-
Has an emergency assembly point been established and communicated?
-
Describe, draw or photograph the assembly point.
-
Add drawing
-
Add media
Sign on
-
By signing, you confirm you have read and agree to all of the above.
-
Nominate an assembly point before beginning works.
-
Start travel
-
Start on-site
-
Finish on-site
-
Finish travel
-
Water off
-
Water on
-
Was there more than one shift on this job?
-
Start travel
-
Start on-site
-
Finish on-site
-
Finish travel
-
Client representative sign-off
-
Operator sign-off
-
Comments
-
Additional Photos