Title Page
-
CONVENTION
-
CONVENTION DATE
-
FACILITY
-
LOCATION
-
INSPECTION DATE
-
CONTRACT NEGOTIATOR
-
INSPECTION MADE BY
-
DAMAGE FOUND BEFORE THE START OF INSTALLATION WORK
DAMAGE
-
OBSERVATION
-
AREA
- AUDITORIUM
- BATHROOM
- HALLWAY
- LOBBY
- LOADING DOCK
- MEETING ROOM
- LOUNGE
- MECHANIC ROOM
- OFFICE
- OUTSIDE LOBBY
-
FLOOR
- 1st
- 2nd
- 3rd
- 4th
- 5th
- BASEMENT
-
ROOM or SECTION
-
OBSERVATION DESCRIPTION
-
RISK LEVEL
-
PICTURE
-
DRAWING
CLOSING
-
ADDITIONAL COMMENTS
-
ARE ALL THE AREAS OF FACILITY INSPECTED?
-
WAS THE FINDINGS COMMUNICATED TO THE CONTRACT NEGOTIATOR ?
-
SIGNATURE