Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Is the Verisae login on site visable ?
-
Is the Bluetooth connection on site working?
-
Is the scheduled job uploaded on Verisae?
-
Is the operative able to close the job down as complete on Verisae?
-
How long did the operative have to wait for a site representative to sign the completed work off?
-
How long did the job take including sign off from start to finish?
Untitled Page
I