Title Page
-
Conducted on
-
Document#
-
Customer
-
Dwg. No & Rev
-
Work Order#
-
Prepared by
VESSEL INSPECTION
Ports Orientation
-
Verify all ports orientation as per drawing
WELDING INSPECTION
-
Top Head-Shell
-
Bottom Cone/head -Shell
-
Shell-Shell (All courses)
-
CIP Port - Head
-
PRV Port - Head
-
Hop Dosing Port- Head
-
Lifting Lugs-Head
-
Shell longitudinal seam
-
Aux. Port – Shell
-
Sample Tap-Shell
-
Manway-Shell
-
Racking Arm Port
-
Drain port - Bot. Head
-
Legs & Legs bracing welding
-
Thermal Well
-
Jacket Welding - Shell
-
Jacket Welding – Bottom Head
-
In/Out Coolant Ports Welding & orientation (All Jackets)
External finishing/welding
-
Dents
-
Scratches
-
Blend lines
-
External : Weld Colour, Rust & Pickle marks
-
Skin Welding (shell - cone seam)
-
CIP assembly & CIP Line
-
Check for Tell-tale hole
-
Beauty Rings (Legs)
-
Manway - Protruding 1" out of skin
-
Coolant inlet-outlet ports labels
-
Check for internal rusting after vessel hydro
-
Adjustable footpads
-
Check Leg sleeves
-
Plaque & SN# ID Tag information as per dwg
Internal Welding/Finish Inspection
-
Ports welding (sample tap, Carb Port or other Aux Ports) as per dwg
-
Blend lines internal
-
Internal Ra =
-
Shell Long./Circ seam insp
-
Rust Marks Inside
-
Welding colour or heat marks
-
Spray Ball installed
Testing
-
Racking Arm Interference with bottom head
-
Jacket Hydro Test (shell & cone)
-
Vessel Hydro Test
Pictures
-
Upload Pictures