Report Information

Milford Dam Visual Inspection Report

  • File Name

  • Document No.

  • Conducted on

Audit Information

Auditor

  • Auditor

  • Other Auditor

  • Person
  • Name

  • Company

  • Signature

Dam Info

  • Weather Conditions

  • Comment

  • Rain Gauge (mm)

  • Signs of Unauthorised Entry

  • Signs of Unauthorised Entry

  • Comment

  • General Comment

  • Add Visual Aid

  • Photo

  • Drawing

Reservoir

Reservoir

  • Reservoir Banks

  • Other Issues

  • Reservoir Level (m)

  • Reservoir Volume (ML)

  • Level sensor & Telemetry

  • Other

  • Call Entura Help desk
    Ph: 6245 4369

  • General Observations

  • Add Visual Aid

  • Photo

  • Drawing

Dam Wall

Dam Wall

  • Upstream Face

  • Other

  • Debris at Upstream Face

  • Crest

  • Other

  • Dam Survey Points

  • Damage Or Vandalism

  • Downstream Face

  • Other

  • Piezometer Readings

Piezometer 1 (Chainage 313m - RL 184.82m)

  • Time of Reading

  • Temperature

  • Frequency

  • Period

Piezometer 2 (Chainage 313m - RL 184.75m)

  • Time of Reading

  • Temperature

  • Frequency

  • Period

Piezometer 3 (Chainage 460m - RL 186.90m)

  • Time of Reading

  • Temperature

  • Frequency

  • Period

Piezometer 4 (Chainage 460m - RL 187.16m)

  • Time of Reading

  • Temperature

  • Frequency

  • Period

  • Standpipe Reading

Standpipe

  • Water Depth (m)

  • Comments

  • Add Visual Aid

  • Photo

  • Drawing

Spillway

Spillway

  • Is Dam Spilling

  • Spillway Approach

  • Other Issues

  • Crest

  • Other Issues

  • Unlined Spillway Chute

  • Other Issues

  • Rock-Lined Spillway Chute

  • Other Issues

  • Stilling Basin

  • Other Issues

  • Comments

  • Add Visual Aid

  • Photo

  • Drawing

Inlet/Outlet Works

Inlet

  • Pontoon

  • Comment

  • Intake Pipe

  • Flap Gate

  • Comment

  • Intake Chamber

  • Comment

Isolation Valve

  • Isolation Valve

  • Contact Bill Whinnett
    Ph: 0409 947 788

  • Comment

  • Isolation Valve Pit

  • Comment

Outlet

  • Pipe works

  • Comment

  • Outlet Valve

  • Contact Bill Whinnett
    Ph: 0409 947 788

  • Comment

  • Valve Release (ML/Day)

  • Outlet Valve Rating

  • Comments

  • Add Visual Aid

  • Photo

  • Drawing

Downstream of Dam

Downstream Of Dam

  • Left and Right Banks

  • Other Issues

V-Notch Readings

  • V-Notch Readings

  • Downstream Toe (mm)

  • Culvert beneath d/s access Rd (L/s)

  • Left Abutment Drain (L/s)

  • Comments

  • Add Visual Aid

  • Photo

  • Drawing

Secondary Spillway

Secondary Spillway

  • Spillway Crest

  • Other Issues

  • Comments

  • Add Visual Aid

  • Photo

  • Drawing

Summary

Summary Of Required Actions

  • Are there any items which require more detailed Monitoring?

  • Comment

  • Is an inspection by specialist personnel required?

  • Comment

  • Is further advice required?

  • Comment

Sign Off

  • Add signature

Contacts

  • Ben Roberts - LSIS Manager

  • Mobile : 0487 357 445
    Email : Ben.Roberts@tasmanianirrigation.com.au

  • Mike O'Shea - Emergency Event Manager

  • Mobile : 0448 389 930
    Email : Mike.OShe@tasmanianirrigation.com.au

  • David Wightman - Dam Safety Engineer

  • Work : (03) 6398 8414
    Mobile : 0418 352 884
    Email : David.Wightman@tasmanianirrigation.com.au

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.