Title Page

  • Contract Name:

  • Contract No:

  • Area Ref:

  • System:

  • Drawing No:

Inspection Details

  • Intermediate cleats fitted on flanged joints where necessary

  • Support rods shortened as necessary

  • Support spacing correct

  • Ductwork routing as per drawing

  • Ductwork size as per drawing

  • Ductwork material as per specification

  • Ductwork joints properly sealed

  • Ductwork stiffeners adequate

  • Ductwork turning vanes installed where applicable, and as per drawing

  • Ductwork branches installed correctly

  • Ductwork expansioncontractions allowed for

  • Fire damper. Location / type / installation frame / independently supported

  • Fire damper access doors fitted at correct side of damper for resetting

  • Volume control dampers, location & type as per drawing

  • Volume control damper inspection door fitted when required

  • Air handling plant, type & location correct

  • Attenuator, type & location correct

  • Heater battery, type & location correct

  • Equipment flexible connections sound

  • Grille flexible connections free from kinks & bends, less than 1 metre in length

  • Grille type & location as per schedule and drawings

  • Ductwork in accordance with DW144 specification

  • Ductwork leakage tests carried out satisfactorily (where required)

Inspected by:

  • Operative/Sub-Contractor Signature:

  • Emtec Supervisor/Manager Signature:

  • Date and Time of Inspection:

Page 1 of 1

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.