Information
-
Template title
-
Inspector
-
Date & Time
-
THIS REPORT MUST BE COMPLETED DAILY
-
ALL VMS EMPLOYEES PRESENT MUST SIGN
-
AT LEAST ONE REP FROM EACH SUBCONTRACTOR MUST SIGN
-
INCLUDE PHOTOS AS APPROPRIATE FOR INDIVIDUAL ITEMS
-
ENSURE THAT YOU INCLUDE SOME GENERAL PHOTOS OF THE JOBSITE
VMS DAILY PROJECT INSPECTION
-
PROJECT NAME
-
CONDUCTED ON
-
PREPARED BY
-
TASK TO BE PERFORMED TODAY
-
LOCATION
-
Personnel and Subcontractors
PERSONAL PROTECTIVE EQUIPMENT
-
SAFETY VEST NEEDED?
-
HARD HAT NEEDED?
-
Why?
-
SAFETY GLASSES NEEDED?
-
HEARING PROTECTION NEEDED?
-
PERSONAL FALL PROTECTION NEEDED?
-
DUST MASK NEEDED ?
-
ARE ALL PPE ITMES READILY AVAILABLE AND ONSITE IF NEEDED?
HOUSEKEEPING
-
SITE CLEAN WITH NO DEBRIS?
-
MATERIALS ARE STORED CORRECTLY?
-
ARE FALL ZONES, WORK ZONES, AND OTHER HAZARDS DELINEATED?
-
AREAS ARE CLEAN WITH NO TRIP HAZARDS?
TOOLS AND EQUIPMENT
-
ELECTRICAL CORDS ARE INSPECTED TODAY?
-
LADDERS ARE INSPECTED TODAY?
-
ALL GUARDS ARE INSTALLED AND WORKING PROPERLY?
-
ALL EQUIPMENT DAMAGED IS TAGGED AND OUT OF SERVICE? (click on follow up if equipment need immediate attention)
-
IS THE OPERATOR OF THE EQUIPMENT TRAINED?
HAZARDOUS COMUNICATION
-
SDS SHEET ON SITE FOR THE CHEMICALS/MATERIALS IN CONTACT?
-
ALL CHEMICALS STORED PROPERLY AND LABELED?
EMERGENCY EQUIPMENT
-
FIRE EXTINGUISHER ONSITE AND LESS THAN 50FT FROM WORK AREA?
-
FIRST AID KIT AND EVERYONE KNOWS THE LOCATION?
-
TELEPHONE OR RADIO ON SITE?
EXCAVATION AND TRENCHING
-
IS EXCAVATION OCCURING TODAY? HAS SUBCONTRACTOR DISCUSSED AND/OR PERFORMED THE FOLLOWING?
-
DIG SAFE NUMBER/ SITE IS MARKED?
-
POWER LINES LOCATION ARE IDENTIFY AND LESS THAN 10FT FROM REACH?
-
VISUAL SOIL TEST HAS BEEN PERFORMED?
-
SOIL CLASIFICATION
-
DEPTH OF THE EXCAVATION?
-
LADDERS ARE AVAILABLE AND AT NOT MORE THAN 25 FT?
-
PURPOSE OF THE EXCAVATION?
-
SLOPE RATIO/TRENCH BOX?
-
IS THERE ANY WATER IN THE TRENCH AND PUMP AND GENERATOR ARE AVAILABLE ON SITE?
-
ARE ALL EMPLOYEES TRAINED ON THE HAZARDS AND PLAN TO PERFORMED THE EXCAVATION?
-
DISCUSS WITH OPERATOR THAT EXCAVATED MATERIAL TO BE LOCATED @ FT MIN FROM THE EDGE OF THE EXCAVATION?
-
HAS PEDESTRIAN AND VEHICULAR HAZARDS BEEN ADDRESSED?
CONFINED SPACE
-
ARE YOU OR A SUBCONTRACTOR WORKING ON A CONFINED SPACE TODAY?
-
GAS MONITOR, TRIPOD, HARNESS, WINCH HAS BEEN INSPECTED?
-
DID THE CONFINED SPACE PERMIT WAS FILLED?
-
HAS THE PRE-ENTRY TEST HAS BEEN PERFORMED?
-
ALL TEAM TRAINED IN THE SPECIFIC CONFINED SPACE TO ENTER?
-
IS THERE ARE PROCEDURE TO MONITOR AIR WHILE PERFORMING THE WORK?
MATERIAL HANDLING
-
CAN YOU LIFT THE LOAD BY HAND?
-
ANY AREAS OF THE BODY THAT CAN BE AFFECTED BY PICKING THE LOAD?
- HAND
- BACK
- KNEES
- FEET
-
HOW HEAVY IS THE LOAD?
-
ARE THE LIFTING DEVICES, STRAPS,CHAINS TAGGED AND CERTIFIED FOR THE LOAD?
-
ARE THE LIFTING DEVICES INSPECTED TODAY?
FALL PROTECTION
-
IS ANY ONE WORKING TODAY HIGHER THAN 4 FT?
-
DO YOU NEED HAND RAILS AND TOES BOARDS?
-
ARE LADDERS TIED TO A FIXED LOCATION AND INSPECTED?
-
ARE YOU USING LIFT LIFE LINES?
-
HAVE HARNESSAND EQUIPMENT BEEN INSPECTED
TRAFFIC CONTROL
-
ARE YOU OR A SUB USING A TRAFFIC CONTROL PLAN TODAY?
-
IS THERE A SPECIFIC TRAFFIC CONTROL FOR THE PROJECT?
-
HAVE EMPLOYEES BEEN TRAINED IN THE TRAFFIC CONTROL?
-
HOW IS IN CHARGE OF THE TRAFFIC CONTROL PACKAGE SET UP AND TRAFFIC CONTROL DAILY PLAN?
-
ARE ALL FLAGGERS CERTIFIED?
-
DO YOU HAVE ALL SIGNS, PADDLES, CONES, BARRELS TO PERFORM A CORRECT TCP?
SAFETY MEETING (EVERY MONDAY) (ALL PERSONS ONSITE MUST ATTEND)
-
DID YOU HAVE A SAFETY MEETING TODAY
-
WHAT WAS THE TOPIC?
-
PLEASE WRITE IF THERE WHERE ANY COMMENTS OR IDEAS
-
DO YOU NEED ADDITIONAL INFORMATION ABOUT A SPECIFIC TOPIC FOR YOUR JOB?
-
ANY PICTURES GOOD SAFETY PRACTICES ON YOUR JOB?
COMMENTS
-
WHERE THERE ANY ACCIDENTS YESTERDAY?
-
Briefly describe the incident/issue
-
Has an accident report been completed
-
EVERYONE WENT HOME WITHOUT INJURIES YESTERDAY?
-
ARE THERE ANY SAFETY ISSUES ON SITE?
-
DO YOU NEED THE SAFETY DIRECTOR?
-
DO YOU HAVE ANY ADDITIONAL COMMENTS?
PHOTOS (Take a couple photos of the jobsite)
-
Using Safety Equipment
-
Work Area
-
Potential Hazard
SIGNATURES (ALL VMS EMPLOYEES AND AT LEAST ONE REP FROM EACH SUBCONTRACTOR)
-
SIGNATURES
-
SIGNATURES
-
SIGNATURES
-
SIGNATURES
-
SIGNATURES
-
SIGNATURES
-
SIGNATURES
-
SIGNATURES
-
SIGNATURES
-
SIGNATURES
-
SIGNATURES
-
SIGNATURES
-
SIGNATURES
-
SIGNATURES
-
SIGNATURES