Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Customer Service Area

  • Viscore/ Job Number

  • Responsible Manager

  • Auditee

  • Company

56 Mobile Network

  • 56.001 Hold down bolts secure, correct orientation and height

  • 56.002 Correct number and size of conduit duct installed between tower and shelter.

  • 56.003 Shelter is as per design. Including type, size and finish.

  • 56.004 Shelter placed within lease area. Shelter and door orientation as per design.

  • 56.005 Landing at entrance of shelter to be 900mm X 900mm. Is to be at least 100mm above the finished ground. Rise from pad to container can be no greater than 230mm and tread must be at least 350mm wide.

  • 56.006 Any holes/openings in the shelter to be filled in (i.e. vermin proof). Including holes from recovered equipment.

  • 56.007 Drainage for rain water installed in the tower base. Check for water in the feeder conduit ducts.

  • 56.008 If any excavation has been performed, the ground must be reinstated. Check that relevant resource consent issues complied with.

  • 56.009 Fencing erected as per design and is secure.

  • 56.01 Fencing is correctly earthed.

  • 56.011 Ensure all new Sunrise cable trays are square and level.

  • 56.012 Check that there are no burrs or sharp edges on new cable trays. All exposed sharp edges must have edge protection on them.

  • 56.013 Check that all cable trays are secured to existing structure properly and that bolts are tight.

  • 56.014 All new cable trays are correctly earthed with 16mm + earth cable. They can just be linked to the next piece of tray with one link to the main earth bar required from whole tray structure (label no 4022 only for the link to Main Earth Bar).

  • 56.015 General condition of site, free of rubbish and hazards. Recovered equipment to be removed from site and disposed of as per Telecom's standards.

  • 56.016 If any trenching has been performed, the ground must be reinstated. Check that the trenches are of the correct size and there are the right number of trenches. Check that relevant resource consent issues complied with.

  • 56.017 Earth connection correctly bonded to the earth mat. 4001 to run from Main Earth Bar to shelter chassis. Then copper strap to earth mat. 35mm required

  • 56.018 Main Earth Bar correctly installed. Is isolated from wall/ironwork.

  • 56.019 All new earth bars correctly installed. Is isolated from wall/ironwork and minimum 70mm^2 earth cable to main earth bar. RF Bar must be linked to external earthing system not main earth bar. Can go to the Surge bar if no other option.

  • 56.02 No exposed copper or aluminium connections.

  • 56.021 All external earth connections to use electrolytic paste. This is not a requirement for internal earthing.

  • 56.022 No joints in any earth or lightning earth cable run.

  • 56.023 70mm^2 earth cable installed from RF Bar (if installed) to building earthing point.

  • 56.024 Mast/tower free from defects. Any rust or loose components must be reported. Check that there are no missing bolts or nuts.

  • 56.025 Mast/tower paint/galvanized finish as per specification/resource consent. All modified (Cut/drilled) galvanized products must be resealed using 'gal spray' or equivalent to ensure the integrity of the steel.

  • 56.026 Correct orientation of tower/head.

  • 56.027 Railok/ climbing rungs/vertical ladder secured, installed correctly. All anchor points are safe and tagged with current certification.

  • 56.028 Digital Microwave Radio (DMR) bracket installed in correct location. Only if new DMR (Microwave Radio is installed as part of Sunrise project)

  • 56.029 Stays appear to have correct tension, no loose ends or fixings.

  • 56.03 Tower doors/hatches padlocked and in good working order.

  • 56.031 Tower access points to be bird/vermin proofed. Use plastic products only.

  • 56.032 Lightening spike (in ground pit) installed as per design. (required on some new sites. Specified in scope of works

  • 56.033 Antenna mounted at correct height to the RF plan and are installed plumb.

  • 56.034 Orientation as per the RF plan. Check with either GPS alignment tool or compass and binoculars.

  • 56.035 Down tilts (mechanical and electrical) as per the RF plan. Mech tilt to be checked when rigger is up structure. E tilt is to be checked either with the CCU on site or the appropriate RET controller. CCU commissioning report is required as a text file as p

  • 56.036 All antenna mount are earthed back to the structure with 16mm earth cable. If mounts are directly bolted to earthed structure this is not a requirement however clear continuity must be achieved.

  • 56.037 Check that each antenna has the Mechanical tilt mechanism installed regardless of whether it is currently in use or not.

  • 56.038 All antenna mounting fixtures are tight and have correct bolts and are at correct tension.

  • 56.039 All antenna mounts are of the correct size for the installed antennas. There is an allowance of 150mm below antenna for cable management if required.

  • 56.04 All ports on antenna are correctly waterproofed whether they are being used or not including RET ports. Plastic cap is not sufficient for external ports.

  • 56.041 Painted if required as per specification/resource consent.

  • 56.042 Antenna or tower mounted amplifiers installed and secured properly as per RF Design. Must have correct 'hose clamp' type brackets.

  • 56.043 Antenna or tower mounted amplifiers earthed with 16mm earth cable.

  • 56.044 Feeder socks and chains installed in tower. Feeder cables to be securely fastened to the chain at top of pole.

  • 56.045 All Feeders are of correct size as outlined in RF Design.

  • 56.046 Feeders are not crossed or twisted at any point of the feeder run.

  • 56.047 All vulnerable cables are bird proofed on horizontal runs. This only applies to sites in the Highlands where Kea's or birds are a problem. This will be specified in the scope of works if required.

  • 56.048 There is no external cable sheath/insulation damage.

  • 56.049 No external cables are in contact with sharp edges.

  • 56.05 All external cables have adequate support. Must be secured to supporting structure every 1m.

  • 56.051 External Tails are all of a Telecom Approved type. Note down all site made tails for future reference. Jumper tails can be no longer than 10m.

  • 56.052 All external cable management is done with stainless steel panduits or bandit straps. Plastic cable ties are not acceptable except for short vertical runs like behind the antennas. These cable ties must be steel tongued and UV rated.

  • 56.053 RF connections to be torqued to 25Nm (-3, +2Nm) for DIN type.

  • 56.054 External RF connections to be waterproof. Must have self amalgamating tape (Rubber) and UV rated PVC tape (Scotch 33 or similar). Glue based heat shrink is acceptable for connectors.

  • 56.055 External RF connections have no visible damage to threads or connector bodies.

  • 56.056 Feeder cables earthed at top of structure.

  • 56.057 Feeder cables grounded near bottom of structure.

  • 56.058 Feeder cables grounded near container entry point (if distance > 7meters from tower base). This applies to all feeder runs whether above or below ground. In some cases this will require the installation of an RF bar at feeder entry point.

  • 56.059 Earth tails free of major bends/curves. This is at your discretion. If there are minor bends due to limited available space for placement of earth bar then it may be acceptable.

  • 56.06 Only 1 crimp lug connected to each ground bar connection point.

  • 56.061 All earth connections to use electrolytic paste.

  • 56.062 External feeder and RET cables are to be labelled with stainless steel Critchley at every interconnection point. (Antennas, every tail join, TMA's). UV rated plastic labels are also acceptable but the slide on type labels are for internal use only.

  • 56.063 Warning signage installed as per construction standards.

  • 56.064 Tower signage required for climbs and RF hazard exposure areas.

  • 56.065 Meter box installed correctly (record serial number).

  • 56.066 New sub board (if required) installed correctly.

  • 56.067 Earth pin and stainless steel tag installed correctly.

  • 56.068 Power (underground) location marks installed correctly.

  • 56.069 Air conditioner airflow not restricted by any new equipment installed.

  • 56.07 Air conditioner condensation drains away properly.

  • 56.071 Optimum cable route followed. Cables must not be run over sharp edges.

  • 56.072 Minimum bending radius maintained.

  • 56.073 Cables adequately supported and secured. Feeder cables are not to be run underneath cable trays.

  • 56.074 No stress placed on internal cables. All cables should be adequately supported and not sag. Cables are not to be self - supporting unless no other option is available.

  • 56.075 Cable ties used to secure any alarm/signal cables must not be overly tight. Make sure that they are not so tight that signal integrity could be impacted.

  • 56.076 Ensure separation of AC, DC, RF and alarm/signal cables.

  • 56.077 Cable ties to be trimmed flush so there are no sharp points or edges.

  • 56.078 Cable runs neat & tidy.

  • 56.079 Cables are run neatly and do not cross or twist at any point of internal run.

  • 56.08 Internal feeder management system is used and neat.

  • 56.081 All connectors are installed correctly and have heat shrink installed. Check Torque settings on connectors. Should be 25Nm (-3, +2Nm) for DIN type 7/16 connectors.

  • 56.082 All RF tails and feeders are correctly labelled.

  • 56.083 Feeders need to be staggered correctly. Feeders within the same sector need to be the same height. For Omni sites, all feeders must be the same height.

  • 56.084 Bending radius of feeder cables and internal tails is not exceeded. Check for kinking and damage to the insulation.

  • 56.085 RF connectors are undamaged. Check for any damage to connector bodies, Nuts and threads.

  • 56.086 No sheath/insulation damage on any RF cables.

  • 56.087 All internal RF cables are of a Telecom approved type. All site made tails must be identified and recorded. Tails are to be no longer than 10m.

  • 56.088 Cable entry for feeder cables meets current specs. Must have some form of gland installed and be neat and well secured to meet TNZ specs.

  • 56.089 Cable entry for Remote Electrical Tilt (RET) cables.

  • 56.09 Cable entry for AC cables.

  • 56.091 Cable entry for Earth cable.

  • 56.092 Cable entry for Fibre cable.

  • 56.137 UMTS rack isolated from plinth in exchange/TNZ buildings. Nylon washers used on steel plinths or wooden plinths.

  • 56.138 Bolts installed/securely fastened.

  • 56.139 Correct clearance of the UMTS rack from wall. Minimum 75mm. 75mm is recommended, however due to structural issues within huts and containers and space requirements this is not always achievable. Use your discretion to determine whether the clearances on s

  • 56.14 UMTS rack to deflection no more than 5 degrees from vertical.

  • 56.141 All BTS connectors in the UMTS rack are tight.

  • 56.142 For UMTS rack, modules and magazines are fully engaged and secure.

  • 56.143 Check LED status is correct, take note of any fault indicators.

  • 56.144 RF connections to be torqued to 25Nm (-3, +2Nm) for DIN type.

  • 56.145 All RF tails can reach all ports in the same sector at the BTS and Feeder ends for future fault management.

  • 56.146 Unused RF ports must have dust caps.

  • 56.147 UMTS power cables to be 70mm^2 black.

  • 56.148 External alarm cables are to be of a approved solid cored conductor, cables consisting of multi strand conductors ie. NTBY6152 is not acceptable

  • 56.149 Correct coloured heat shrink used. Blue (-), Red (+), Green/Yellow (Earth).

  • 56.15 All multi - pair cables have sharps protection and cut ends. Heat shrink installed where pair break out of cable.

  • 56.151 Optimum cable route followed. Cables must not be run over sharp edges.

  • 56.152 UMTS rack earth installed correctly.

  • 56.153 Kathrein CCU to be mounted just above the UMTS cabinet with the PCM/Alarm Unit mounted on top. One RU is required between the two pieces of equipment. Equipment to be securely mounted.

  • 56.154 Excess CCU cable coiled neatly and is not blocking the vented section on top of the UMTS rack. Can be on top of CCU, on top of UMTS rack or in horizontal tray so long as it is neat and doesn't block airflow.

  • 56.155 All cables labelled correctly in UMTS rack.

  • 56.156 Rubbish removed and no debris left in UMTS rack.

  • 56.157 Check UMTS rack/cabinet for any cosmetic or structural defects.

  • 56.158 Eaton rack isolated from plinth in exchange/TNZ buildings. Nylon washers used on steel plinths or wooden plinths.

  • 56.159 Eaton rack mounting bolts installed/securely fastened.

  • 56.16 Correct clearance of the Eaton rack from wall. Minimum 75mm. 75mm is recommended, however due to structural issues within huts and containers and space requirements this is not always achievable. Use your discretion to determine whether the clearances on

  • 56.161 Eaton rack to deflection no more than 5 degrees from vertical.

  • 56.162 Connections in Eaton rack securely fastened.

  • 56.163 Excessive exposed copper conductors is not acceptable at the point of DC and AC circuit breaker terminations

  • 56.164 All multi - pair cables have sharps protection and cut ends. Heat shrink installed where pair break out of cable.

  • 56.165 Correct coloured heat shrink and cable used in Eaton rack. Blue (-), Red (+), Green/Yellow (Earth).

  • 56.166 Optimum cable route followed. Cables must not be run over sharp edges.

  • 56.167 Spare battery termination (BLUE) insulated in Eaton rack.

  • 56.168 Spare battery termination (RED) insulated in Eaton rack

  • 56.169 Eaton rack earth correctly installed. Only one earth required. Old standard of one earth to common bar and one to Eaton Chassis is not acceptable.

  • 56.17 All multi - pair cables have sharps protection and cut ends. Heat shrink installed where pair break out of cable.

  • 56.171 All cables labelled correctly in Eaton rack. Labels must be placed as close as practical to the termination point of cables. Labelling only at top of rack where it enters is not acceptable.

  • 56.172 Do not disconnect label installed on earth cable at Eaton rack and earth bar ends

  • 56.173 Plastic cover over AC breaker is correctly labelled with AC origin and breaker position.

  • 56.174 A4 laminated sheet for labels and positions of CB's required to be stuck inside Eaton door. Must match the positioning and size of breakers installed.

  • 56.175 AC C/B to be 63amp installed in Eaton rack.

  • 56.176 AC C/B to be 40amp installed in sub-board. If single phase feed installed ensure correct bridging is done at AC breaker in Eaton rack.

  • 56.177 Correct DC C/B rating: UMTS 125amp, GSM 100amp, Katherine CCU 6-20amp, GSM Bias T - PDU 20amp, Plato clocking unit 20amp, 7705 15-20amp.

  • 56.178 Protective cover installed over the A/C CBs on the left side of the rack.

  • 56.179 All breakers are correctly secured. All screws are tight.

  • 56.18 DC C/B in the correct position in Eaton rack. UMTS position 2, GSM cabinet 1 position 3, Kathein CCU position 10, GSM Bias T PDU position 11, 7705 position 12.

  • 56.181 Correct quantity of rectifiers installed as per the design pack. Control unit - 1st position, Phase 1 - position 2-4, Phase 2 - position 5-7 and Phase 3 - position 8-10.

  • 56.182 Batteries in Eaton rack secured correctly, including use of seismic straps.

  • 56.183 Battery Grease used on all externally housed battery connection terminals.

  • 56.184 Battery terminals are correctly torqued. Must be between 5 & 7 Nm. This is firm but not overly tight.

  • 56.185 Tested and results recorded on site.

  • 56.186 Battery temperature sensor to be mounted above battery string one.

  • 56.187 Rubbish removed and no debris left in Eaton rack.

  • 56.188 Check Eaton rack/cabinet for any cosmetic or structural defects.

  • 56.189 Check the voltage output of the Eaton rack and record voltage. Should be around 54volts, 56-57volts indicates a fault which should be reported to the DE.

  • 56.19 Check that the Monitor unit has been upgraded to the latest version of the software. Ensure a sticker indicating the software has been upgraded in on the inside of the door.

  • 56.191 7705 rack mounted to wall or in roadside cabinet securely without interfering with other equipment.

  • 56.192 Use the power harness included with the 7705 for the power. One harness required if containers and shelters, 2 required in TNZ exchanges. If supplied lengths are not long enough, junction boxes must be used to join DC cables.

  • 56.193 All multi - pair cables have sharps protection and cut ends. Heat shrink installed where pair break out of cable.

  • 56.194 All connections in 7705 rack securely fastened.

  • 56.195 7705 earthed correctly. Earth cable to be a minimum of 2.5mm^2 for 7705 unit with earth run to earth point for chassis. Plato unit needs 2.5mm earth to the rack as well. Provided star washer must be used to ensure good conductivity between the lug and the

  • 56.196 7705 Housing earthed to MEB with 16mm^2 green/yellow cable to chassis rail. Paint needs to be removed to ensure good conductivity.

  • 56.197 Minimum bend radius of 30mm for fibre cable. Cable to not stick out of 7705 housing. To ensure this requirement is met the 7705 should be mounted in the fifth mounting hole back from the front.

  • 56.198 When rack in mounted vertically fibre must be supported on side vertical run so as not to put tension on connector. Velcro should be used to secure the fibre. Coiled excess fibre is to be neatly laid on bottom panel underneath Modules.

  • 56.199 Velcro ties should be used to route and manage slack Optical Fibre pigtails

  • 56.2 Convoluted tube must be anchored as close as possible to cabinet entry.

  • 56.201 Krone blocks labelled correctly in 7705 rack.

  • 56.202 All cables labelled correctly in 7705

  • 56.203 Rubbish removed and no debris left in 7705 rack.

  • 56.204 Check 7705 rack/cabinet for any cosmetic or structural defects.

  • 56.205 Provide Cable Record Sheet in Plastic Protector Adjacent to the Rack

  • 56.206 Krone frame mounted securely and placed appropriately

  • 56.207 All new KRONE frames must be earthed with 16mm minimum back to RF bar or MEB.

  • 56.208 The cables running into the Krone frame are to be neat and secured correctly.

  • 56.209 The jumpers need to be run neatly and with enough slack to allow for re-termination.

  • 56.21 All jumpers run out the correct side of Krone blocks. Pairs 1-5 out the left hand side. Pairs 6-10 out the right hand side.

  • 56.211 Krone label holders are installed correctly and are not damaged.

  • 56.212 All Krone blocks are labelled correctly.

  • 56.213 Electrical compliance certificate must be available at time of audit. If not onsite ring DE to find out where about.

  • 56.214 Red lined RF block diagram to match onsite installation.

  • 56.215 Cable labelling schedule NDF39 to match timing of installation.

  • 56.216 Site entry label

  • 56.217 Standard OSH personal protective equipment evident and in use (fit for purpose).

  • 56.218 Electrical equipment current certification (test & tagged).

  • 56.219 Appropriately trained personnel on site (Certificates, relevant ID cards etc).

  • 56.226 Lighting adequate for safe and comfortable performance of work.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.