Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Job Number
-
Job Name
-
Report prepared by:
-
Select date
-
Floor:
-
Area:
-
Room/Corridor:
Waste and Vent Piping
-
Sizing verified per contract and shop drawings?
-
Slope is verified per contract and shop drawings?
-
All Piping and fittings are installed plumb and square?
-
All couplings are installed square?
-
All couplings have been tourqued?
-
Storm/Overflow piping verified no cross connect?
-
Clean outs are installed as shown?
-
Pictures of clean outs
-
Risers are supported at the base?
-
Pictures of Riser supports
-
All Piping has been tested per spec?
-
All rough in heights are verified?
-
Inspection drawings are up to date and signed?
-
Picture of Inspection drawings
-
Clean outs are installed as required?
Waste and Vent Hangers
-
Hangers installed at locations/spacing per spec?
-
Hanger size and model per submittal?
-
Vertical hanger rods are plumb?
-
All hanger rod nuts and cross bolts are tight?
-
Seismic/Sway Bracing installed as required?
-
Picture of Seismic/Sway Bracing
Labels
-
Labels are installed per spec and in clear locations
-
Pictures of labels
-
Storm/Overflow labels not crossed?
-
Directional arrows are verified correct
In Wall Strapping
-
Urinal secure and set at elevation
-
Picture of urinal
-
Strapping at intervals per spec?
-
Couplings are secured/rodded as required?
-
Picture of coupling support
-
Riser clamps are installed?
-
Fire caulking is complete?
-
Test Tee's/Wye's are not protruding out of the wall?
-
Pictures of Test Tee's/Wye's
-
Plugs and caps installed in test Tee's/Wye's
-
Pictures of installed caps and plugs in Test Tee's/Wyes
-
Clean outs are clearly identified and cut out for?
-
Water closet carriers are anchored per Manufacturers instructions?
-
Picture of installed water closet carrier
-
Notes, Impacts, or Comments
-
Signature of report preparer