General Arrangement
-
Access to all levels available?
-
Empty bins available?
-
All bins labelled?
-
Any bins damaged?
-
Efficient lighting to all reception points?
-
Adequate routes to remove from site?
-
Adequate signage to show locations of waste points on all floors?
-
Adequate labour for unloading & transporting material?
Non-hazardous Reception Point
-
Drawings showing locations?
-
Signage for points?
-
Monitoring form?
-
Empty bins available?
-
Correct waste in labelled bins?
-
Clear access to reception point?
-
Enough bins available for each point?
-
All bins not overloaded?
Hazardous Reception Point
-
Drawings showing locations?
-
Correct number of drums?
-
Spill kit?
-
Drip tray?
-
Monitoring form?
-
Correct waste in labelled drums?
-
Coffin for tubes?
-
Correct signage for points?
-
Drums not overloaded?
-
Clear routes to remove from site?
-
All drums labelled correctly?
Waste recycling station
-
Drawings showing location?
-
Correct segregation of waste?
-
Overloaded waste areas?
-
Correct plant?
-
Correct signage?
-
Plant monitoring form?
-
Equipment PAT tested?
-
Good access to separated waste areas?
-
Clean & tidy?
-
Good access to plant and material?
-
Good access to processing area?
-
Any plant damaged?
Handling equipment
-
Do we have what we require?
-
Tested?
-
All equipment secure when not in use?
-
Any equipment damaged?
-
"Just in time" deliveries?
-
Correct vehicle type delivering?
Excess Material
-
Removed from site & relocated?
-
Not left onsite for longer period?
-
Material reuse?
PAPERWORK
Risk Assessments
-
Register?
-
Risk assessments made site specific?
-
Signed by relevant employees?
-
Issued to client?
Method Statements
-
Register?
-
Site specific method statements?
-
Signed by relevant employees?
-
Issued to client with submittal report?
COSHH
-
Register?
-
COSHH assessments made site specific?
-
Signed by relevant employees?
-
Issued to client?
Manual Handling
-
Register?
-
Manual handling assessment made site specific?
-
Signed by all employees?
-
Issued to client?
-
MH for lifting materials and bins?
Noise Assessments
-
Noise assessments made site specific?
-
Signed by relevant employees?
-
Issued to client?
Accident procedure
-
Forms and procedure available?
-
Accidents recorded and faxed?
-
Records of accident issued to client?
Training Certs / Plant Authorisation
-
Matrix for training kept on site?
-
CSCS and other certs for all employees on site?
-
Office matrix updated with certs from site?
Toolbox Talks
-
Register?
-
Correct choice of toolbox talks?
-
Signed by all employees?
-
Carried out weekly?
-
Issued to client?
Registers
-
Waste Register
-
PPE Register
-
Plant Register
-
PAT Testing Register
Machinery
-
Weekly Plant Inspection
-
Lifting equipment and accessories
-
Forklift Inspection
Other
-
PPE Assessment
-
LL Waste management document on site
-
Specific lifting equipment
-
All waste transfer notes kept on site
-
Relevant waste certificates kept on site
-
Does client provide SWMP report (Monthly)?