Title Page
-
Document No.
-
Audit Title
-
Conducted on
-
Client : Department of European Union Investments
-
Prepared by
-
Location
Event
Event details
-
Event Location
-
Event occured
-
Event photos
-
Definition of event
Notification
-
Is the event notified to the Consultant ?
-
Date and time of Notification
-
Notified by
-
How do you learn the event ?
-
from whom ?
-
Date and Time to learn
Responsibility
-
Is the event caused by Contractor ?
-
Responsible of Event (Foreman or Engineer)
-
Is the work comply with MoS and H&S Plan ?
-
What is the main reason to the event ?
- Procedure
- Equipment
- Method
- Human (training)
- Human (Skill)
- Work Conditions
- Timing of Task
- Other
-
Explain in the reason.
-
Who is the responsible ?
Water Supply Reporting
-
Is there any interruption of water supply ?
-
Water Supply shut-down
-
Water Supply Take-into-operation
-
Is the water supply shut-down made by MESKI ?
-
Who has made the shut-down ?
-
Is the MESKI notified ?
-
Who is the notified Staff from MESKI ?
-
Date and Time of Notification
Closing of Events
Damaged Utilities
-
Is there any utilities damaged during event ?
-
Enter the damaged utility
Utility
-
Name of Utility
-
Type of Utility
- Electricity
- Telecommunication
- Natural Gas
- Irregation
- Drainage
- Waste Water
- Out of Operated
- Others
-
Shoot the photo
-
Repairing works made by
-
Take in to operation ?
-
Date and Time of Operation Start
-
Material used for repairing
-
Signature by related Utility Operator's Representative
-
Estimated Cost of repair
-
Site Supervisor of Consultant
-
Please complete the event under supervision of Consultant
-
Signature of Contractor's Site Manager
-
Please sign the event report by only Site Manager (Hüseyin Dönertaş)
-
Signature of Contractor's Representative
-
Only by Contractor Representative (Mr.Aziz Ünal)
Engineer's Comments
-
Engineer's recommendations for future works
-
Engineer's Representative