Title Page

  • Site conducted

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Location

Water Splitter Box

Splitter Box

  • Is Box 3 in use?

  • How much process water is added to Box 3. GPM

  • Is Box 4 in use?

  • How much process water is added to Box 4. GPM

  • Is the Spillover in use?

  • Is there tailings flowing through both the 48" & 60" pipelines? (If flow through 48" pipeline is reddish brown at splitter box & flow seems minimal, check 48" pipeline at A.25 box for possible pipeline sanding issue, report sanding to manangement)

  • How much process water is added to the Spill Over. GPM

  • Is the heat trace and insulation in good condition?

  • Is the MCC building in good condition?

  • Is the house keeping good?

  • Are there any safety issues or problems with the Splitter Box?

  • Operator

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.