Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Scaffold check list
-
Scaffold Sub Contractor
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
This inspection sheet confirms that the item or area detailed above is 100% completed in line with the current drawings although still remaining Sub Contractors responsibility .
-
Signed on behalf of Sub-Contractor
-
Signed on behalf of Main Contractor