Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Pre Work Inspection (to be completed prior to beginning work)

  • Purchase order has been received.

  • Building area is staked and lot pins are in place.

  • Area to be cleared is clearly marked and the Site Superintendent and the Trade Contractor have walked the area together.

  • Any natural undisturbed area is marked and understood.

  • Direction of water drainage has been determined and is understood.

  • Area to place trees, stumps, and development debris has been designated by the Site Superintendent and the Trade Contractor understands the location and how the debris is to be collected, etc.

  • Site Superintendent:

  • Trade Contractor: Business Name: (printed)

Final Inspection: (to be completed before Trade Contractor leaves job site)

  • All debris has been removed from the lot.

  • Lot is roughly level with no holes, hills, valleys, etc.

  • Pad has been cut and measured to determine correctness of size.

  • House pad is correctly located.

  • Driveway is cut and ready for stone.

  • Undisturbed natural area is still undisturbed.

Summary

  • Project superintendent

  • Trade Contractor: Company Name (printed):

  • Project manager

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.