Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Pre Work Inspection ( to be completed prior to beginning work)

  • Plans have been reviewed, the house walked, and any special areas noted.

  • Purchase order has been received. <br>

  • Outside area of building is clean and free of debris.

  • Siding is complete. All trim is installed and undamaged.

  • Roofing is complete.

  • Final grading is complete.

  • Windows are intact and none are broken.

  • Site Superintendent:

  • Trade Contractor: Company Name (printed)

Final Inspection: (to be completed before Trade Contractor leaves job site)

  • Windows are intact and none are broken.

  • Trim and siding are undamaged.

  • Gutters are firmly attached to building and are 5" inch.

  • Gutter and downspouts contain only minor piecing.

  • Gutter have no holes or gaps.

  • An adequate number of downspouts are installed.

  • Downspouts are firmly attached to house with no gaps or bows and are 3"x4"

  • Downspouts terminate into gutter drains.

  • Water flow from downspouts is correct

  • Site is clean and free of debris.

Summary

  • Date: Project superintendent:

  • Trade Contractor: Company Name:

  • Project manager

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.