  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Pre Work Inspection ( to be completed prior to beginning work)

  • Plans and selection sheets have been reviewed with Site Superintendent.

  • Purchase order has been received.

  • Windows are intact with none broken.

  • Vinyl floors are protected.

  • Tubs, showers, countertops, etc.,are protected.

  • All drywall is installed, taped, mudded, and sanded.

  • Drywall is straight with no bows or depressions.

  • Joints in drywall are smooth and clean.

  • Drywall has no excessive nicks, gouges, scrapes, etc.

  • Drywall has no raised face paper from over sanding.

  • Corners have no hairline cracks.

  • Drywall has no nail pops or loose nails.

  • Trim fits properly around all windows.

  • Trim fits properly around all doors.

  • Base has no nicks, gouges, scratches, damage, etc.

  • Nails are set properly in base at correct depth with no protruding nails.

  • Base is secured tightly, corners are correct and tight.

  • Base around cabinets is tacked in place.

  • All doors are installed according to plan, and are plumb, square, the proper distance for carpet or vinyl, and swing correctly.

  • Attic accesses are installed correctly and all trim is in place.

  • There is no missing trim in any room.

  • Chair rail or crown is installed, if required by plans or options.

  • Unit is broom swept, clean, and free of debris.

Final Inspection: ( to be completed before Trade Contractor leaves job site)

  • Exterior wall paint has no light spots and uniform coverage.

  • Exterior trim paint has no paint walls, uniform coverage, and uniform color.

  • Exterior paint job inspected from 6-foot distance (entire job) with no visible defects.

  • No paint is on windows, brick, stucco, or other areas.

  • Metal lintels are clean using (2) coats of Alkyd Enamel painted black with a gloss finish.

  • Exterior doors to be painted with (2) top coats of A 100 Satin latex house and Trim Paint.

  • Exterior Metal Railing is to be painted with (1) coat Pro-Cryl Universal Primer: (1) coat Macropoxy 646 Fast Cure Epoxy; and (1) topcoat Polylo HP Polyurethane.

  • Interior walls are smooth with no drips, runs, lumps, bumps, color variations, or streaking.

  • Interior walls have uniform coverage after first coat is sprayed using ProMar 200 Latex wall paint with an eggshell finish.

  • All rough spots have been repaired in interior trim. Nail holes are filled and sanded smooth.

  • First coat trim paint applied using ProMar 200 Alkyd semi-gloss enamel.

  • Excess trim paint on walls has been cleaned off.

  • Over spray has been cleaned from windows (glass and aluminum).

  • There is no damage to floors from spills, drips, etc.

  • There is no damage to vinyl.

  • All interior wood is caulked.

  • All exterior wood is caulked.

  • All gaps between the brick mold and brick are caulked.

  • All thresholds are caulked.

  • Windows are intact with none broken.

  • Tubs, sinks, showers, etc., have no damage.

  • Unit is broom swept, clean, and free of debris.

Summary

  • Date: Project superintendent:

  • Trade Contractor: Company Name:

  • Project manager

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.