Pre Work Inspection ( to be completed prior to beginning work)

  • Plans have been reviewed with Site Superintendent.

  • Purchase order has been received. <br>

  • Work area is clean and free of debris.

  • Material is stocked and ready to be used.

  • Windows are intact - none broken.

  • Tubs are covered and protected.

  • Ducts are covered.

  • All details are framed ( access holes, special ceilings, scuttle holes, etc.)

  • Framing items are correct -- no bowed studs, no nails protruding into drywall area.

  • Site Superintendent:

  • Trade Contractor: Company Name (printed)

Final Inspection: (to be completed before trade contractor leaves job site.)

  • Drywall is tightly fitted to walls.

  • Drywall does not float in any area, and is secure at all openings. (closets, windows, doors, etc.)

  • Nails and screws are 16 inches on center.

  • All fasteners are taped, mudded and sanded.<br>

  • Joints are smooth and sanded.

  • There are no gaps, spaces, or broken pieces of drywall at electrical boxes.

  • Electrical boxes are free of mud and metal debris.

  • There are no gaps larger than1/4 inch around tubs, showers, windows and door.

  • There are no hairline cracks in any corner, vault, trey, ceiling line, and ceilings are finished and blend with existing ceilings.

  • There are no un-drywalled holes left in the HVAC closet

  • All drywall joints are taped, mudded, and sanded.

  • Paper is smooth, not over sanded.

  • Walls are flat and smooth, with no visible bumps in joints due to rough edges. All existing walls have been repaired and are smooth and ready for paint.

  • Centerline of vault is straight and crisp.

  • All corners are taped and smooth with no metal corner bead showing.

  • Temporary handrails and bracing are in place.

  • There are no windows broken.

  • Tubs and showers are covered and undamaged.

  • Drywall has been removed from floor. Floor is broom swept.

  • All debris have been removed to designated site.

Summary

  • Date: Project superintendent:

  • Trade Contractor: Company Name:

  • Project manager

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.