Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Pre Work Inspection

  • Plans have been picked up and signed for.<br>

  • Purchase order has been received .<br>

  • Material is on site and ready to be used .

  • House is clean, broom-swept, and free of debris.

  • Garage is clean.

  • Windows are intact and unbroken.

  • Stairs are installed.

  • Drywall is undamaged.

  • Vinyl is undamaged.

  • Ducts are covered.

  • Tubs are covered and undamaged.

  • Sink, cabinets, and countertops are covered and undamaged.

  • Cabinets are set.

  • Doors are framed plumb and of correct size.

  • Plan used to check carpet and vinyl areas.

  • Swing of doors is clearly marked on inside of each door jamb.

  • Disappearing stairs are installed, if required.

  • Attic access is framed.

  • Date: Site Superintendent

  • Trade Contractor: Company name printed:

Final Inspection: to be completed before trade contractor leaves job site.

  • Windows are intact and unbroken.

  • Drywall is undamaged.

  • Vinyl is undamaged.

  • Ducts are covered.

  • Tubs are covered and undamaged.

  • Sinks, cabinets, and countertops are covered and undamaged.

  • Base molding is installed securely to walls.

  • Base molding is undamaged and all nicks, gouges, etc., are repaired and sanded.

  • Base molding is level and straight, especially in tight and/or short runs.

  • Crown if required, is secure, level, and straight.

  • Chair rails, if required, are secure, level, and straight.

  • Nail holes are correct depth with no splintering or cracking.

  • Corners are cut correctly and fit snugly.

  • Doors are hung level, plumb, and shimmed.

  • Handrails are installed to the correct length, height, and are straight and secure.

  • Pickets and Newels are installed correctly and securely with no movement.

  • Stair treads are undamaged.

  • Attic access areas are trimmed per plan.

  • Excess material has been removed to garage.

  • All debris has been removed to dumpster.

  • House is clean and broom-swept.

Summary

  • Date: Project superintendent:

  • Trade Contractor: Company Name:

  • Project manager

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.