Pre Work Inspection ( to be completed prior to beginning work)
-
Purchase order has been received. <br>
-
Drywall is complete with no damage.
-
Painting is complete with no damage.
-
Trim is complete with no damage.
-
Windows are intact and unbroken.
-
No damage to vinyl, cabinets, etc., is visible.
-
House is clean and free of debris.
-
Site Superintendent:
-
Trade Contractor: Company Name (printed)
Final Inspection: (to be completed before Trade Contractor leaves job site)
-
Coverings are removed from ductwork.
-
Grilles are installed square and level. In vinyl areas grille are flush to floor and do not tilt more than 1/4 in when stepped on.
-
All grilles in ceilings are fitted flush with ceiling and have proper sealing material.
-
All other grilles fit snugly.
-
HVAC units have been tested to verify correct airflow.
-
Thermostats are square and level.
-
Thermostats have been tested.
-
Instruction and warranty manuals for thermostats, air conditioner, and heater have been placed in kitchen drawer to left of range.
-
Air conditioning condensation unit is set level and operating.
-
Condensation pump, if applicable, is clean, free of debris, and operating properly.
-
Hot water tank vent pipe is installed.
-
After gas inspection, the pressure gage has been removed and pipe capped.
-
House is clean and free of debris
-
House has passed final HVAC inspection. Attach photo of report.
Summary
-
Date: Project superintendent:
-
Trade Contractor: Company Name:
-
Project manager