Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Pre Work Inspection ( to be completed prior to beginning work)
-
Plans have been picked up and signed for.
-
Purchase order has been received. <br>
-
Permits have been received.
-
Necessary framing ( chases, etc.) are complete.
-
Temporary stairs are in place.
-
Temporary handrails are in place.
-
Safety bracing is in place.
-
Plumber has completed work, pipes are in place etc.
-
Interior work area is clean and free of debris.
-
Site is clean and free of debris.
-
Electricity is available.
-
If units are to be set in attic, the scuttle hole for the attic HVAC equipment access is framed, the HVAC unit area is floored, and adequate working area is available.
-
House is roofed and shingles are installed.
-
HVAC units have been verified for correct type and tonnage.
-
Site Superintendent:
-
Trade Contractor: Company Name (printed)
Final Inspection: (to be completed before Trade Contractor leaves job site)
-
Heating unit(s) has been set with necessary clearances on all sides.
-
No ductwork is crimped, bent, or damaged so as to restrict airflow.
-
Adequate space in heating unit area has been verified so that ductwork will not obstruct necessary maintenance, changing of filters, etc.
-
Attic unit is properly set, and ducts are not crimped, bent, or otherwise damaged if unit are to be placed in attic.
-
All piping to the exterior of the house is complete and sealed properly.
-
All ducts are properly sealed to boots.
-
All ducts are properly sealed to the heat exchanger.
-
All ductwork is properly secured.
-
All air returns and vents are properly sealed to floor and placed per plan.
-
All flor ducts are securely covered.
-
All gas cutoffs are installed properly and are accessible. (fireplace, clothes dryer, furnace, etc.)
-
Locations of thermostats are correct per plan.
-
Gas pressure is adequate.
-
System has passed rough HVAC inspection. Attach picture of report.
-
House is broom swept and clear of debris.
-
No debris is left on lot.
Summary
-
Date: Project superintendent:
-
Trade Contractor: Company Name:
-
Project manager