Pre Work Inspection ( to be completed prior to beginning work)

  • Plans have been reviewed, including finished basement.

  • Purchase order has been received. <br>

  • Rough inspections are completed and the house has passed inspections.

  • House is clean and free of debris.

  • All windows are intact and unbroken.

  • Exterior doors are weatherstripped and sealed.

  • All windows are weatherstripped and sealed.

  • Bottom plate is sill sealed.

  • Temporary stairs, if required, are in place.

  • Temporary handrails are in place.

  • Temporary safety bracing is in place.

  • HVAC ductwork is installed.

  • Ducts are covered and protected.

  • Plumbing pipes, tubs, showers, etc., are installed and undamaged.

  • Electrical wiring and boxes are in place.

  • Exterior insulation and sheathing board are in place, unbroken, undamaged, or repaired with no gaps or missing pieces .

  • Site Superintendent:

  • Trade Contractor: Company Name (printed)

Final Inspection: (to be completed before Trade Contractor leaves job site)

  • All windows are intact.

  • Tubs, showers, etc., are undamaged.

  • All temporary handrails and safety bracing are intact.

  • All penetrations to the outside are sealed.

  • A minimum of three (3) rulers is clearly visible in the attic and is in contact with ceiling decking.

  • All wall batts fit snugly at the top, bottom, and sides, and are fastened correctly and cover all areas.

  • Vaults and tray ceilings have batt insulation.

  • Insulation is of the correct R-value in all areas.

  • Basement walls are insulated including the block foundation if the basement is finished.

  • Ceilings of garages and/or basements that are under heated areas are insulated.

  • Walls between unheated areas and heated areas are insulated.

  • All attic access areas are weather stripped.

  • Ceiling plated and headers are sealed.

  • Insulation has been placed behind wiring, not stuffed around or covering wiring.

  • Insulation behind receptacle boxes and switch boxes does not block the front.

  • All windows and exterior doors have insulation in jacks and headers.

  • House is clean and broom swept.

  • All building debris has been removed to dumpster.

Summary

  • Date: Project superintendent:

  • Trade Contractor: Company Name:

  • Project manager

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.