Pre Work Inspection ( to be completed prior to beginning work)
-
Plans have been picked up and signed for.
-
Purchase order has been received. <br>
-
Tubs , Sinks, etc. , are covered and protected, and are free of damage.
-
Temporary handrails, if required , are installed.
-
Safety bracing is in place as needed.
-
If house requires two HVAC units, the attic access is ready to wiring.
-
House is roofed and shingled.
-
House is broom swept, clean, and free of debris.
-
Site Superintendent:
-
Trade Contractor: Company Name (printed)
Final Inspection: (to be completed before Trade Contractor leaves job site)
-
Temporary power pole is set and temporary power is on.
-
Wiring is complete for light switches and receptacles per plan.
-
All receptacle boxes are set square, plumb, and 3/8 past stud.
-
Bracing for ceiling fans, as required, is installed.
-
Wiring for thermostats is complete.
-
Wiring for smoke detectors, washer, dryer, flood lights, etc., is complete.
-
Wiring for HVAC units is complete.
-
Wiring for outside receptacles is complete.
-
Outside disconnects are installed.
-
Breaker box is installed.
-
Breakers are clearly and legibly labeled.
-
Emergency stickers are in place on breaker box.
-
Site and house is clean and free of debris.