Pre Work Inspection ( to be completed prior to beginning work)
-
Unit is clean and free of debris.
-
Purchase order has been received. <br>
-
Drywall is complete with no damage.
-
Painting is complete with no damage.
-
House is broom swept, clean, and free of debris.
-
Tubs , Sinks, etc. , are covered and protected, and are free of damage.
-
All receptacle boxes are clean and free of drywall mud and other debris.
-
Unit is at stage for final electrical to be completed.
-
Site Superintendent:
-
Trade Contractor: Company Name (printed)
Final Inspection: (to be completed before Trade Contractor leaves job site)
-
All faceplates are installed square, plumb, and snug against walls.
-
All receptacles are tested and work as required.
-
All appliances are hooked up and tested.
-
All light fixtures are installed and tested.
-
Smoke detectors, strobes, and co detectors are hooked up and tested.
-
Outside disconnect has been tested.
-
HVAC fans are hooked up and tested.
-
Bath fans are hooked up and tested for a 10 minute delay.
-
Recessed heat lamp and timer in bathroom is tested.
-
Wire for switch for the range hood in kitchen has been tested.
-
Inspection has passed.
-
Picture of the Inspection Report.
-
Unit is clean and free of debris.
Summary
-
Date: Project superintendent:
-
Trade Contractor: Company Name:
-
Project manager