Pre Work Inspection
-
Has a purchase order been received?<br>
-
Color selection sheet(s) has been received
-
Cabinet areas are field measured.<br>
-
Windows are intact with none broken.<br>
-
Tubs are covered and undamaged.
-
Temporary stairs (if required), temporary handrails, and safety bracing are installed.
-
Building is broom swept, clean, and free of debris.
-
Site Superintendent:
-
Trade Contractor: Company Name (printed)
Final Inspection: (to be completed before Subcontractor leaves job site.
-
Windows are intact with none broken.
-
Temporary handrails, safety bracing, etc., are intact.
-
Cabinets are installed per plan (correct number, size, etc.)
-
Cabinets are secured correctly and tightly to wall
-
Color of cabinets and countertops is correct.
-
Colored caulk is used if colored cabinets and countertops.
-
Cabinet doors and drawer fronts are level and square.
-
Cabinet faces and corners are level and plumb.
-
All doors and drawers open and close correctly.
-
Correct hardware is installed, square, plumb, and correctly.
-
Screws attaching hardware have not splintered the wood.
-
Kick plates are installed with no gaps or holes.
-
HVAC vent is cut correctly. Shoe molding will fit below vent.
-
Cabinets are undamaged.
-
Cabinets are intact with no unfilled holes.
-
Shelves are level and undamaged.
-
The number of shelves is correct.
-
For adjustable shelves, all holders fit, none are missing, and are level.
-
For all rollout shelves, operation is smooth and shelves track tight and secure.
-
Lazy susan(s) are installed plumb, work correctly, and are secured tightly.
-
Cabinets are clean inside and out.
-
Countertops are protected with cardboard that is taped securely.
-
Building is clean, broom swept, and debris removed.