Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Pre Work Inspection
-
Verify any special item with Site Superintendent.
-
Purchase order has been received.
-
Unit is clean with no trash and debris.
-
Faceplates are in place on all switches and receptacles.
-
cabinets are complete with hardware, shelves, etc.
-
Appliances are installed.
-
Drywall and Painting are complete.
-
All trim is installed.
-
Vinyl is installed.
-
Carpet is installed.
-
Doors are installled.
-
All hardware is installed.
-
Site superintendent:
-
Trade Contractor: Company Name: (printed)
Final Inspection: (to be completed before Trade Contractor leaves job site)
-
NOTE: All area to "dusted" must be free of dust or grit when a hand is brushed across the surface.
-
All walls are dusted with no smudge marks.
-
Vinyl, hardwood, parquet is mopped and cleaned with no black marks or adhesive.
-
All windowsills and trim are dusted with no smudges.
-
Mirrors are clean and shiny with no drywall dust on tops or sides or scratches.
-
Sinks, showers, tubs and toilets are clean and shiny with no drywall dust on top ledges and no scratches.
-
Faucets, shower heads, and other such fixtures are clean and shiny with no scratches.
-
Ductwork and return air grilles are vacuumed.
-
Windows are clean and shiny with no scratches.
-
All hardware is clean and shiny (towel bars, toilet paper holders, etc.
-
Cabinets are clean inside and out.
-
Countertops are clean and shiny and no scratches.
-
Appliances are clean inside and out.
-
Light fixtures are clean and shiny with no fingerprints, dust, or smudges.
-
Shelving is dusted and clean.
-
Carpet is vacuumed with no spots.
-
Thresholds are clean, free of dirt, mud, etc.
-
Trash is removed to correct location.
-
Unit is in "move-in" condition.
Summary
-
Project superintendent
-
Trade Contractor: Company Name (printed):
-
Project manager