Information
-
Report Title - Enter 'Weekly Site Checklist'
-
Week No.
-
Site Name:
-
Conducted on
-
Prepared by
-
Location
Documentation
-
Is there a signing in book available?
-
Is there a suitable Traffic Management Plan system in place and is it documented?
-
Have Exits and Escape Routes clear of any obstructions and that they lead to a safe place?
-
Have the location and condition of fire extinguishers been checked?
-
First aid box - ensure its contents are complete, in date and replenish as required
-
Accident Book - has this been checked and any accidents / incidents reported to head office?
-
Are PPE and RPE issue records being maintained?
-
Do you have sufficient stocks of PPE and RPE? (Including visitor)
-
Have you walked the perimeter of the site, ensuring all fencing is secure and adequate signage displayed?
-
Is scaffolding in a good condition and displaying a valid inspection certificate (within last 7 days)?
-
Are all leads, sockets and electrical equipment in good condition, PAT tested with any defective equipment quarantined or removed from site?
-
Is all lifting equipment in good condition and have you checked that you have access to its valid and relevant lifting certificate?
-
Have plant and machine defect reports been completed by the machine operators? Have machine hours been completed on the same form?
-
Have all defect reports been uploaded / saved onto Dropbox for this week? (Note that this is over and above, reporting immediately any material defect)
-
If flame cutting is being carried out - has a valid permit been issued?
-
Flame cutting equipment - has a check been carried out of the condition of all hoses, leads, regulators etc
-
Has the welfare and toilet facilities been cleaned and serviced?
-
Ensuring that at all times, waste is removed / placed into designated skips, access and egress to work areas is maintained and safe working practices are being adopted, do you now consider the site to be in a safe condition to allow works to continue
-
Comments;
Summary
-
Add Tx
-
Site Manager