Title Page

  • Site conducted

  • Location
  • Assessor's Name

  • Date and Time

Inspections

  • All Tests must be conducted after 07.30 am in built up areas due to noise pollution.
    Make staff aware of test times
    When activating a call point, make sure the sounder is activated for a minimum of 15 seconds
    Call points should be tested once a week on a rotational basis so that every call point is activated at least once per year.
    All faults MUST be addressed as soon as possible.

Fire Alarm

  • Which call point was tested?

  • Did the call point activate the alarm?

  • Did all other call points pass a visual inspection?

  • Was the alarm panel fault free and all LEDs operating correctly?

  • Is any remedial action required?

Automatic Doors And Shutters

  • Did all automatic shutters operate correctly?

  • Did all automatic door releases operate correctly?

  • Is any remedial action required?

Sprinkler System

  • Did the sprinkler system operate correctly?

  • Did the jockey pump activate correctly?

  • Did the float valve return to its correct position?

  • Is any remedial action required?

undefined

Sign Off

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.