Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Piping inspection week 1

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping inspection week 2

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping inspection week 3

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 4

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 5

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 6

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 7

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 8

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 9

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 10

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 11

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 12

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 13

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 14

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 15

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 16

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 17

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 18

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 19

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 20

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 21

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 22

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 23

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 24

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 25

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 26

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 27

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 28

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 29

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 30

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 31

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 32

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 33

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 34

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 35

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 36

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 37

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 38

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 39

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 40

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 41

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 42

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 43

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 44

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 45

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 46

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 47

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 48

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 49

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 50

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 51

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

Piping Inspection week 52

  • You must inspect each line below, if you find leak, please tick YES and comment in the end.

  • D.I. HCl lines: HCl

  • D.I. Caustic lines: NaOH

  • D.I. system back wash to T-016 HCl/NaOH

  • SO4 Scrubber inlet line H2SO4

  • SO4 Scrubber circulation lines H2SO4

  • Sulphamic Scrubber feed line NaOH

  • Feed line into R209 NaOH

  • R209 to Mx06 Pt Hydroxide

  • NH3 condensate line into 200lt. Drum NH3

  • Acid condensate line into 200lt. Drum Acid

  • Mx09 to R218 line CPA

  • MX09 to R217 line CPA

  • MX09 to R-216 line CPA

  • MX09 to R-209 line CPA

  • MX09 to R-207 line CPA

  • MX09 to R-201 line CPA

  • MX09 to Shipping Area line CPA

  • T-023(R-220 area) to R213 Distillate

  • Feedline into R220 HCl & Hno3

  • Feedline into R221 HCl & Hno3

  • F23 to T-018 P Salt wash

  • F23 to T-019 P Salt M/L

  • F03 to T-020 TPtHCO3

  • F04 to T-020 TPtHCO3

  • Caustic Scrubber to T-016 NaOH

  • Caustic Scrubber Recirculation lines NaOH

  • Fundebac to Cone Tank Pt Oxide M/L

  • Fundebac to T-016 Wash Water

  • Rhodium Press line to T-016 Wash Water

  • HCl dosing line to T-016. HCl & NaOH

  • Ammonia Scrubber line to T-017 NH3

  • Tank T-021 to Tank 017 Treated Liquor

  • P Salt wash to R-206 P. Salt

  • T013 to R206 TPtHCO3 M/L

  • Reactor R206 to Tank 021 Treated Liquor

  • Reactor R207 to Tank 021 Treated Liquor

  • NaOH dosing line to NH3 Sc. tank. NaOH

  • R 219 Recirculation line TPTN

  • R-219 Nitric Acid line HNO3

  • Inspected by:

  • Date of inspection

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.