Information
-
Document No.
-
Conducted On:
-
DOC Project Number:
-
Project Name:
-
Prepared By:
Weekly Safety Audit
General Information
-
Project Manager:
-
Superintendent:
-
Subcontractors On Site:
-
Weather Conditions:
-
SECTION 1 - Administration (questions answered on initial visit and every 6 months throughout construction)
-
Frequent/regular safety inspections conducted?
-
SDS manual on site?
-
OSHA 300 log posted?
-
Safety meetings held regularly?
-
Safety manual on site?
-
Federal, state, insurance postings?
-
Visitor PPE available?
-
Visitor sign-in form in use?
-
SECTION 2 - Medical / Emergency - questions answered on initial visit and every 6 months throughout construction
-
First-aid kit on site?
-
First-aid/CPR certified personnel identified?
-
Emergency action plan posted?
-
Emergency numbers posted?
-
Eye wash available?
-
Required fire extinguishers present?
-
Map to medical facility posted?
-
Team contact numbers available?
-
Air horn on site?
-
SECTION 3 - Pre-Task Planning Review
-
Add line for each subcontractor reviewed
Sub
-
Subcontractor Name:
-
Adequate steps listed?
-
Complete and documented?
-
Completed by foreman?
-
Has the potential for injuries/hazards been identified?
-
Hazard controls identified?
-
Reviewed with crew?
-
SECTION 4 - Site / Public Protection - questions answered on initial visit and every 6 months throughout construction
-
Adequate site lighting?
-
Barricades installed properly?
-
Excavations protected?
-
Falling object protection adequate?
-
Perimeter fences in place?
-
Public protection signage in place?
-
Traffic control plan available and in use?
-
SECTION 5 - Excavations - list sub observed in notes
-
Competent person identified and on site?
-
If depth of trench > 6' is fall protection in use?
-
Daily inspections documented and available for review?
-
Access/egress points within 25' of work?
-
Excavation > 20' engineered?
-
Perimeter protection/barricade in place?
-
Sloped, benched, or support of excavation done properly?
-
If trench box in use, is tabulated data available?
-
Spoils pile 2'-3' from edge?
-
Surface encumbrances identified?
-
Surface traffic exposure protected from exposure?
-
Proper controls in place for the presence of water?
-
SECTION 6 - Fall Protection - list sub observed in notes
-
Fall protection at 6' ?
-
Fall protection properly anchored?
-
Fall protection harness & lanyard properly worn?
-
Exterior/interior guardrails at proper height?
-
Floor/wall opening protected?
-
Floor covers adequate, secure, labeled?
-
Roof edge protected?
-
Controlled access zone setup correctly?
-
Proper impalement protection? (rebar caps, etc)
-
Are stair/ramp/walkway protections adequate?
-
SECTION 7 - Ladders / Stairs - list sub observed in notes
-
Ladders 3' above landing/secured properly?
-
Are corrals/barricades present at top of landing?
-
Ladders clear of debris/materials?
-
Extension ladder 4:1 pitch?
-
Ladders inspected for defects?
-
Job-built ladders to ANSI standard?
-
Job-built ladders secured?
-
Landings and treads filled?
-
Proper use of ladder?
-
Rails at stairs/landings?
-
Safe working distance from energized lines?
-
Slip/trip exposure eliminated?
-
Stairs illuminated?
-
SECTION 8 - PPE - list sub observed in notes
-
-
Safety glasses/face shields worn and used properly?
-
Are gloves being properly used?
-
Are hard hats being worn?
-
Is hearing protection being worn as needed?
-
Is high visibility outerwear being worn?
-
Proper footwear worn as required?
-
Other PPE requirements met? (face shield, welding chaps, etc)
-
SECTION 9 - Respirator Use - list sub observed in notes
-
Has respirator been cleaned prior to use?
-
Has the user been fit tested?
-
Has the user been medically qualified?
-
Respirator program available for review?
-
Qualified person identified?
-
Right respirator for the job being used?
-
Respirators not in use properly stored?
-
Training records available for review?
-
SECTION 10 - Scaffolds - list sub observed in notes
-
Competent person identified and on site?
-
Scaffold designed by qualified engineer if over 125' ?
-
Is the scaffold deck within acceptable distance from the structure?
-
Proper grade of scaffolding in use? (light, medium, heavy)
-
Daily inspections documented and available for review?
-
Bracing and pins in place?
-
Casters locked?
-
Compatible components used?
-
Exterior/interior guardrails at proper height?
-
Full planking/toeboards?
-
Scaffold secured to structure?
-
Proper access to platforms?
-
Proper loading of materials?
-
Safe work distance from energized lines?
-
Scaffold grade planks being used?
-
Sills, plates, jacks installed?
-
Working surface in safe conditions, free of accumulated snow and debris?
-
SECTION 11 - Scissor / Arial Lifts - list sub observed in notes
-
Proper connection of electrical feed to controls?
-
Equipment loaded properly?
-
Gate or chain secured?
-
Workers tied-off properly while in boom lifts?
-
Are workers working from boom lift platform safely?
-
Lift operating on flat surface?
-
Proper operator training?
-
Proper use of lift?
-
Safe work distances from energized lines?
-
Boom lift platform free of holes?
-
SECTION 12 - Cranes & Hoisting Equipment - list sub observed in notes
-
Crane placement survey completed?
-
Equipment inspected and properly rated for task?
-
Annual inspection current?
-
Daily inspections current?
-
3 months of daily inspections present?
-
Boom angle indicator working?
-
Is operator certified or qualified?
-
Crane supported and level?
-
Minimum approach distances from energized lines maintained?
-
Fire extinguisher in crane?
-
Flagman identified?
-
Load chart posted?
-
Lift plan on file?
-
Loads properly secured?
-
Means of communication adequate?
-
Operator manual in crane?
-
Outriggers extended properly and on cribbing?
-
Safety latches used?
-
Swing radius barricaded?
-
Tag lines used?
-
Weight of load verified?
-
Has rigging been inspected?
-
SECTION 13 - Steel Erection - list sub observed in notes
-
Falling object protection?
-
Lay down area barricaded appropriately?
-
Limited access to lay down area?
-
Critical lift procedure being utilized?
-
Site layout/sequence plan completed and available?
-
Structural flooring requirements met?
-
SECTION 14 - Motorized Equipment - list sub observed in notes
-
Back-up alarm functioning?
-
Fire extinguisher in cab?
-
Flagman used?
-
Glass free of obstructions and cracks?
-
Horn functioning?
-
Roll over protection?
-
Seat belts used?
-
SECTION 15 - Hand and Power Tools - list sub observed in notes
-
Tool in good condition?
-
Cord in good condition?
-
Ground prong in place?
-
Guards and handles in place?
-
Proper tool for the job?
-
If lasers are in use, is proper signage posted?
-
SECTION 16 - Powder Actuated Tools - list sub observed in notes
-
Proper disposal of mis-fire cartridges?
-
Adequate tool condition?
-
Training documentation available?
-
SECTION 17 - Electrical - list sub observed in notes
-
Adequate temporary lighting?
-
Adequate task lighting?
-
Cords in good condition?
-
Cords protected from traffic?
-
Electrical room protected?
-
Energized parts protected?
-
GFCI's used properly?
-
Permanent power in use?
-
If temporary power boxes are in use, is location of feed labeled on box?
-
Voltage posted on temporary power box?
-
SECTION 18 - Fire Protection - list sub observed in notes
-
Emergency vehicle access adequate?
-
Fire extinguisher accessible, charged and inspected?
-
Fire suppression equipment available?
-
Fire watch properly conducted?
-
Proper signs in storage areas?
-
Proper fuel containers used?
-
SECTION 19 - Housekeeping - list sub observed in notes
-
Is housekeeping being maintained/adequate?
-
Are protruding nails properly taken care of?
-
Clear access to building/site?
-
Proper material storage?
-
Roadway around project clear?
-
Have slip, trip, or fall hazards been addressed?
-
Trash in protected containers?
-
Walkways clear?
-
Adequate means of egress?
-
SECTION 20 - Material Storage / Handling - list sub observed in notes
-
Cylinder storage/secured?
-
Material stacked/racked properly and securely?
-
Non-compatible gases separated?
-
Proper distance from edge?
-
Proper equipment used?
-
Proper lifting procedures?
-
SECTION 21 - Confined Space - list sub observed in notes
-
Atmospheric conditions tested and appropriate?
-
Permit entry requirements followed?
-
Harness/extraction equipment inspected?
-
Regular inspections and air monitored?
-
Rescue plan/emergency #'s/map established?
-
Ventilation adequate?
-
Confined space entry checklist completed and available for review?
-
SECTION 22 - Hazard Communication/GHS - list sub observed in notes
-
Copy of program on site?
-
Training documentation available for review?
-
Chemical inventory list available?
-
SDS's (site specific) available?
-
Proper labels on containers?
Additional Comments & Notes
-
Notes:
-
Additional Photos:
Project Leadership Signatures
-
Safety Signature - Person Completing Audit
-
DOC Project Rep Signature
-
Additional Signature
-
Additional Signature