Administrative Procedures
-
A project loss prevention program has been established?
-
A current loss prevention manual is on site?
-
A current Hazard Communication Manual is on site?
-
MSDS are provided and filled for substances on site?
-
Tool box talks are being conducted weekly?
-
A pre-planning meeting was conducted to discuss possible safety or liability hazards prior to job start up.
-
Safety violations are being issued for non-conformances<br>
-
Accident reports are being sent to safety department
Safety Notices
-
Is there a designated safety bulletin board?
-
Do you have your project start-up
-
Have you posted the following; OSHA 300 and 300A, EEO, Hazard Communication, Wage, OSHA Rights, Emergency #’s, posters ? <br><br>
Medical Services (First Aid)
-
Is a First Aid kit available and stocked on site ? <br><br>
-
Are stretchers or stokes littler needed on site?
-
Is there someone on site who is CPR and First Aid Trained?
Sanitation
-
Is potable (drinking) water and adequate toilet facilities available?
-
Are washing facilities available?
Personal Protective Equipment (PPE)
-
Are hard-hats worn at all times on the construction site?
-
Are employees trained in the use of PPE?
-
Are employees provided with eye and face protection as needed?
Fire Protection
-
Has a Fire Protection Plan been developed for the project?
-
Is firefighting equipment conspicuously located?<br>
-
Is a water supply available and of sufficient pressure to operate fire fighting equipment?<br>
-
Do all fire extinguishers meet the requirements established?
-
Are requirements for storage and use of flammable liquids being complied with?
-
Are flammable liquids clearly identified and labeled?
Material Storage, Handling, and Disposal
-
Are materials properly stacked, stored, or blocked to prevent falling?
-
Are aisles and walkways kept open of materials ? <br><br>
-
Are waste materials properly disposed of ? <br><br>
-
Are aisles and walkways kept open of materials?
-
IBM- Contractor storage free of chemicals?
Tools (Hand and Power)
-
Are hand and power tools maintained in safe condition?
-
Are tools properly guarded?
-
Are all tools properly grounded and in good repair?
-
Do operators of powdered actuated tools have certification?
Welding and Cutting
-
When transporting or storing gas cylinders, are cylinders secured, upright, and valve protection in place?
-
Are torches inspected at the beginning of each shift for leaks at valves, regulators, couplings, and connections?
-
Are oxygen cylinders kept away from grease and oil ? <br><br>
-
Are oxygen and fuel gases separated 20’or by a ½ hr. fire rated barrier? <br><br>
-
Are employees instructed in the safe use of compressed gases and arc welding safety ? <br>
-
Are welding and cutting operations kept clear of combustible materials? <br><br>
-
Are shields available and used to prevent flashes to other employees ? <br><br>
Electrical
-
Is there adequate clearance from overhead power lines ? <br><br>
-
Are employees working near electric power protected against shock ? <br><br>
-
Is the project using GFCI protection on all branch circuits ? <br><br>
-
Are electrical components marked to identify their functions ? <br><br>
-
Are extension cords and tools provided with ground plugs ? <br><br>
-
Are temporary lights provided with guards ? <br> <br>
-
Are electrical components in damp or wet areas waterproof ? <br><br>
-
Are electrical lines strung overhead to prevent tripping and electrical hazards ? <br><br>
-
Are all cords and tools free from defects ? <br><br>
Scaffolding
-
Are scaffolds erected and dismantled by competent persons ? <br><br>
-
Are guardrails, midrails, and toeboards provided where necessary ? <br><br>
-
Are scaffolds plumb and level ? <br><br>
-
Is good housekeeping being maintained on scaffolds?<br>
-
Are scaffold grade planks being used? Are all planks in good condition?<br>
-
Are scaffolds provided with outriggers when the height exceeds four (4) times the minimum width?
-
When rolling scaffolds are moved, have employees removed or secured tools and materials from scaffold?
Floor and Wall Openings
-
Are floor and wall openings properly guarded with standard?
-
Are skylight openings protected by guardrails?
-
Are hoist areas provided with a means of fall protection?
-
Are open sided floors or elevated platforms six feet above ground properly guarded?
Cranes and Derricks
-
Is use of equipment in compliance with manufacturers specifications and limitations ? <br><br>
-
Are rated load capacities, operating speeds, hand signals , posted in cab of equipment ? <br><br>
-
Is equipment inspected before each use ? <br><br>
-
Is equipment inspected before each use?
-
Are accessible areas in the swing radius barricaded?
Motor Vehicles
-
Are employees who drive company vehicles had their driving record checked by the safety department ? <br><br>
-
Are unattended vehicles left locked and secured from the general public? <br><br>
-
Are vehicles parked on an incline blocked or parking brake set ? <br> <br>
-
Are vehicles checked before each shift ? <br><br>
-
Are seats and seat belts provided for each passenger ? <br><br>
Excavations and Trenching
-
Are excavation permits filed prior to any excavating? <br><br>
-
Are excavations supervised by a competent person? <br><br>
-
Are excavations properly sloped, shored or shielded? <br><br>
-
Is MISS Utility or other agency informed prior to excavations? <br><br>
-
Are all excavations exceeding 20 feet in depth being reviewed and are systems designed by professional engineer? <br><br>
-
If employees must cross excavations are walkways provided ? <br><br>
-
If employees must cross excavations are walkways provided ? <br><br>
Concrete and Masonry
-
Are concrete mixers provided with guards? <br><br>
-
Is form work and shoring capable of supporting all loads during placement ? <br><br>
-
Are rebars covered with caps or other protection ? <br><br>
-
Are employees provided with PPE when pouring concrete ? <br><br>
-
Is a limited access zone established for masonry walls ? <br><br>
Steel Erection
-
Is permanent or temporary flooring installed as erection progresses ? <br><br>
-
Is fall protection used when work is more than 30 feet above the lower level ? <br><br>
-
Are tag lines used for controlling loads ? <br><br>
-
Are floor openings securely guarded or decked over ? <br><br>
-
Are the required perimeter cables installed correctly ? <br><br>
-
Are the local/state steel erection rules observed ? <br><br>