Information

  • Conducted on

  • WHS Committee Member/s

  • Project Name

  • Project Number

  • Project Address
  • Project Manager

  • Site Manager / Foreman

  • FDC Division: Fitout / Const / Tech / Mech

  • 1. FDC Site Risk Assessment Form

  • 2. Review FDC Site Safety and Environmental Plan

  • 3. Site Diary used

  • 4. Safe Access and Egress (to and from Site and Work Areas)

  • 5. Check protective measures:

  • Safe provision for public rights of way

  • Protection to building tenants (if applicable) - their roads and footpaths, and internal paths of travel

  • 6. Develop Site Emergency Evacuation Plan (specific)

  • 7. Daily Register of all contractors on site. Signing IN/OUT

  • 8. Site Induction carried out for all contractors and visitors on site and recorded

  • 9. Injury Register completed for all accidents - copy forwarded to FDC Head Office

  • 10. Toolbox Meetings - evidence / records of having them conducted

  • 11. Evidence of Site Safety Inspection WEEKLY (SM/SF)

  • 12. Evidence of Site Safety Audit MONTHLY by PM

  • 13. Safe Work Method Statements from Sub-Contractors

  • 14. Develop SWMS for all FDC Workers on site

  • 15. Insurances - Workers Compensation (date / validity)<br> Insurances - Public Liability (date / validity)

  • 16. Hazardous Substances Register for all hazardous substances on site

  • 17. MSDS Register - Material Safety Data Sheets available for all corresponding Hazardous Materials

  • 18. Suitable SAFE Storage for Hazardous Substances

  • 19. Plant - sample check FDC and Subcontractors plant (includes hired plant). Evidence of plant - maintenance records / log book / operating instructions

  • 20. Sample Check Certificates of Conformance for - scaffolds, hoists, chutes, cranes, concrete pumps, loading platforms, load shifting plant.

  • 21. Post Site Contact Management signage visible to visitors (SITE SPECIFIC)

  • 22. Post Emergency Evacuation Plan (SITE SPECIFIC)

  • 23. Post Site Safety Rules and Signs (SITE SPECIFIC)

  • 24. Post Site FIRST AID OFFICER (SITE SPECIFIC)

  • 25. Post FDC's Safety, Rehabilitation and Drug and Alcohol Policy

  • 26. Post "Working for You" - Workcover poster

  • 27. Post Return to Work Program (Workers Comp)

  • 28. Fire Prevention ie. Extinguisher/s, Base Building services and general housekeeping

  • 29. Lighting is adequate to conduct work safely

  • 30. Storage of Building Materials - leads tidy, nothing to trip over or get caught on

  • 31. Amenities are adequate - Toilets, Lunch Room, Water

  • 32. First Aid Kit/s on site and fully stocked

  • 33. Sample Check - Licensed / ticketed operators with Certificates of Competency required for: scaffolders, riggers, dogmas, crane/hoist, concrete boom, load shifting machines, explosive power tools

  • 34. Electrical: <br> - All tools and equipment tagged - MONTHLY<br> - Cords supported above work areas, wet areas and passageways<br> - Earth leakage devices on all electrical switchboards

  • 35. Hot Works e.g. Oxy/Acetylene flame, Cutting and Grinding - check for HOT WORKS PERMITS records<br> - Fire extinguisher in immediate proximity of work<br> - Protection screens used<br> - Face Shield, Goggles and Gloves - PPE

  • 36. Personal Protective Equipment is worn as required by signage or work method.

  • 37. Falling Object Protection: eg Hardhats, barricades, kick boards, O/H Protection, lanyards for tools

  • 38. Working at Height >2.0m:<br> - Scaffold or Fall Arrest System<br> - Not within 4.0m of Live Wires<br> - 1m high Guardrails for drops >2.0m

  • 39. Scaffolding:<br> - >4.0m by licensed scaffolder<br> - Inspected once a month

  • 40. Raised Access Flooring:<br> - Are open floor areas barricaded off?

  • 41. Excavations and Penetrations are:<br> - Securely covered or barricaded <br> - <1.5m deep shored or battered

  • 42. Mobile Scissor / Booms:<br> - Elevated Work Platform required if reach is over 11 metres<br> - Safety harness required if reach is over 11 metres<br> - Safety vest to be worn<br> - Knuckle boom user must have:<br> - Safety vest and harness<br> - Certificate of Competency<br> - Barricades must be erected

  • 43. Ladders in good condition and used correctly. Random Site Check - record details

  • 44. Dust Suppression / Removal devices, isolation of work area and good housekeeping are in place when Hazardous Dust (Silica, MDF) is generated. High Traffic Areas, Water and personnel available to control dust

  • 45. Noise areas identified and hearing protection worn when required

  • 46. Safety audit of sub-contractor - Are workers performing works in accordance to SWMS.

  • 47. Environmental Issues - Water Runoff / Soil Erosion<br> - Sediment control plan developed, implemented

  • 48. Environmental Issues - Waste<br> - Waste bins available, Management areas tidy

  • 49. Environmental Issue - Concrete Washout Areas<br> - CWOA established<br> - Washout area in tidy condition

  • 50. Trafficable Areas - clear access for site deliveries, loading dock areas identified and safe

  • Any other items / Comments / Summary

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.