Information
-
Conducted on
-
WHS Committee Member/s
-
Project Name
-
Project Number
-
Project Address
-
Project Manager
-
Site Manager / Foreman
-
FDC Division: Fitout / Const / Tech / Mech
-
1. FDC Site Risk Assessment Form
-
2. Review FDC Site Safety and Environmental Plan
-
3. Site Diary used
-
4. Safe Access and Egress (to and from Site and Work Areas)
-
5. Check protective measures:
-
Safe provision for public rights of way
-
Protection to building tenants (if applicable) - their roads and footpaths, and internal paths of travel
-
6. Develop Site Emergency Evacuation Plan (specific)
-
7. Daily Register of all contractors on site. Signing IN/OUT
-
8. Site Induction carried out for all contractors and visitors on site and recorded
-
9. Injury Register completed for all accidents - copy forwarded to FDC Head Office
-
10. Toolbox Meetings - evidence / records of having them conducted
-
11. Evidence of Site Safety Inspection WEEKLY (SM/SF)
-
12. Evidence of Site Safety Audit MONTHLY by PM
-
13. Safe Work Method Statements from Sub-Contractors
-
14. Develop SWMS for all FDC Workers on site
-
15. Insurances - Workers Compensation (date / validity)<br> Insurances - Public Liability (date / validity)
-
16. Hazardous Substances Register for all hazardous substances on site
-
17. MSDS Register - Material Safety Data Sheets available for all corresponding Hazardous Materials
-
18. Suitable SAFE Storage for Hazardous Substances
-
19. Plant - sample check FDC and Subcontractors plant (includes hired plant). Evidence of plant - maintenance records / log book / operating instructions
-
20. Sample Check Certificates of Conformance for - scaffolds, hoists, chutes, cranes, concrete pumps, loading platforms, load shifting plant.
-
21. Post Site Contact Management signage visible to visitors (SITE SPECIFIC)
-
22. Post Emergency Evacuation Plan (SITE SPECIFIC)
-
23. Post Site Safety Rules and Signs (SITE SPECIFIC)
-
24. Post Site FIRST AID OFFICER (SITE SPECIFIC)
-
25. Post FDC's Safety, Rehabilitation and Drug and Alcohol Policy
-
26. Post "Working for You" - Workcover poster
-
27. Post Return to Work Program (Workers Comp)
-
28. Fire Prevention ie. Extinguisher/s, Base Building services and general housekeeping
-
29. Lighting is adequate to conduct work safely
-
30. Storage of Building Materials - leads tidy, nothing to trip over or get caught on
-
31. Amenities are adequate - Toilets, Lunch Room, Water
-
32. First Aid Kit/s on site and fully stocked
-
33. Sample Check - Licensed / ticketed operators with Certificates of Competency required for: scaffolders, riggers, dogmas, crane/hoist, concrete boom, load shifting machines, explosive power tools
-
34. Electrical: <br> - All tools and equipment tagged - MONTHLY<br> - Cords supported above work areas, wet areas and passageways<br> - Earth leakage devices on all electrical switchboards
-
35. Hot Works e.g. Oxy/Acetylene flame, Cutting and Grinding - check for HOT WORKS PERMITS records<br> - Fire extinguisher in immediate proximity of work<br> - Protection screens used<br> - Face Shield, Goggles and Gloves - PPE
-
36. Personal Protective Equipment is worn as required by signage or work method.
-
37. Falling Object Protection: eg Hardhats, barricades, kick boards, O/H Protection, lanyards for tools
-
38. Working at Height >2.0m:<br> - Scaffold or Fall Arrest System<br> - Not within 4.0m of Live Wires<br> - 1m high Guardrails for drops >2.0m
-
39. Scaffolding:<br> - >4.0m by licensed scaffolder<br> - Inspected once a month
-
40. Raised Access Flooring:<br> - Are open floor areas barricaded off?
-
41. Excavations and Penetrations are:<br> - Securely covered or barricaded <br> - <1.5m deep shored or battered
-
42. Mobile Scissor / Booms:<br> - Elevated Work Platform required if reach is over 11 metres<br> - Safety harness required if reach is over 11 metres<br> - Safety vest to be worn<br> - Knuckle boom user must have:<br> - Safety vest and harness<br> - Certificate of Competency<br> - Barricades must be erected
-
43. Ladders in good condition and used correctly. Random Site Check - record details
-
44. Dust Suppression / Removal devices, isolation of work area and good housekeeping are in place when Hazardous Dust (Silica, MDF) is generated. High Traffic Areas, Water and personnel available to control dust
-
45. Noise areas identified and hearing protection worn when required
-
46. Safety audit of sub-contractor - Are workers performing works in accordance to SWMS.
-
47. Environmental Issues - Water Runoff / Soil Erosion<br> - Sediment control plan developed, implemented
-
48. Environmental Issues - Waste<br> - Waste bins available, Management areas tidy
-
49. Environmental Issue - Concrete Washout Areas<br> - CWOA established<br> - Washout area in tidy condition
-
50. Trafficable Areas - clear access for site deliveries, loading dock areas identified and safe
-
Any other items / Comments / Summary