Information
Monthly scheduled safety inspection as required by the Heinz Safety Process
Enter month of audit and fiscal week completed
3.02 Emergency Evacuation
-
Check fire extinguishers against the list below and confirm they are in place, filled and tagged
-
Reception 1 and 2
-
Kitchen numbers 3,4 and 5 (wet chemical)
-
Toilet corridor 6 and 7
-
Courtyard 8,9,10,11,12,13,14
-
Label room 15 and 16
-
Engineering 17, 18,19 and 20
-
Pasteuriser 21 and 22
-
Line 1 23 to 30
-
Staircase well 31 to 32
-
Vaults spirit vinegar area 33, 34, 35
-
Vaults 36,37,42,43,44,45,46,47
-
Compressor room 39
-
Vaults wood working 40 and 41
-
Vaults Depal 48 and 49
-
External 38 under ramp and 50 and 51 near boiler house
-
Warehouse 52 to 56
-
Make house 57 to 64
-
First floor training room, meeting room, F3, and corridors 65 to 71
-
First floor 72 to 78 store room and gate landing
-
Line 2 79 to 83
-
Second floor top of stairs 84 and 85
-
Second floor corridor and kitchen 86 and 87
-
Main office and lift room 88,89 and 90
-
Process plant storage 91 to 97
-
Process plant 98 to 100
-
QA lab 101 to 104
-
Roof lift room 105
-
LPG and security hut 106 and 107
-
Enter details of any failures below
3.05 R AND PPE
-
Is toe protection footwear being worn in non office areas?
-
PPE storage is suitable, clean and accessible
-
Ear protection is available on line 1, process, and Depal?
-
Gloves are available for handling glass breakages on line 1 and are used?
3.06 Confined spaces
-
Reciprocating saw available of emergency access into fibreglass tanks?
3.08 Moving machinery
-
Fixed guards are in place to machinery and securely attached?
-
Interlock switches are in place and working, do a random test. They must not have been tampered with
3.11 Powered Vehicles
-
Have the pre shift driver checks been completed?
-
Are trucks not in use parked safely?
3.16 Compressed gases cylinders
-
Cylinders are adequately secured on the trolley and are free from damage
3.19 lighting
-
Is lighting in the area being inspected adequate and sufficient?
-
Are there any lights that are faulty and in need of replacement?
3.20 legionella
-
Run safety showers for 5 minutes in heat exchanger area and at caustic filling point
3.29 engineering workshop
-
Check bench grinder abrasive wheel guards are in place, 2mm gap between wheel and work plate
-
Welding equipment is secure, safe, extinguisher available, no ptfe tape used, flash back arresters in place
3.32 Walking and working surfaces
-
Walkways were found to be clear and unobstructed
-
Working surfaces are in a good condition and slip resistant and without significant trip hazards
3.38 First aid
-
Check the following first aid stations and eye wash bottle points are adequately stocked and the suppliers are clean and still in date
-
Engineering
-
Makehouse
-
Line 2
-
Vaults
-
Ground floor line 1
-
Process plant
Action required
-
Risk rate any action identified for priority using the standard 3 x 3 risk assessment score of frequency x severity
-
Rating of action identified
- low risk
- low risk
- medium risk
- medium risk
- high risk
- very high risk
-
Rating of action identified
- low risk
- low risk
- medium risk
- medium risk
- high risk
- very high risk
-
Rating of action identified
- low risk
- low risk
- medium risk
- medium risk
- high risk
- very high risk
-
Add signature