Title Page
-
Site conducted
-
Location
Part A - Complete Prior to the Commencement of Work
Preparation
-
Plant / Area to be worked on:
-
Commencing Time and Date:
-
Completion Time and Date:
-
The above area identified, has been isolated from:
-
Ingress of Dangerous Fumes?
-
Sources of Electrical Power:
-
Gas or Liquids under pressure:
-
Steam or Heat:
-
Additional Permits Required:
- Hot Works
- Working at Height
- Electrical
- General
Atmospheric Tests
-
The atmosphere has been found to be satisfactory for work to be carried out with / without * the use of breathing apparatus:
Safety Precautions
-
In addition to isolation procedures listed above in Part A above, select the safety precautions that have been taken:
- Breathing Apparatus
- Lifebelt And Rope Held On The Outside Of The Confined Space
- Eye Protection
- Protective Clothing
- Dust Respirator
- Non-Sparking Approved Tools
- Exhaust Fan
- Others (please specify)
-
Comment:
Authorisation
-
Name of Authorized Ace Express Staff Member:
-
Date and Time of Authorization:
Acceptance of Permit
-
I hereby confirm that the necessary safety precautions have been taken and it is now safe to enter the confined space mentioned in this permit
-
Name of Contractor Company:
-
Signature of Contractor:
PART B - POST COMPLETION OF WORK
-
The work has / has not * been completed and all personnel under my supervision withdrawn.
-
Comment:
-
Name of Contractor and Company:
-
Contractor Signature:
Cancellation of Permit
-
The work has been completed and all personnel, materials and equipment have been withdrawn:
-
The work has not been completed but all personnel have been withdrawn:
-
This permit is now cancelled. A new permit will be required to allow work to continue:
-
Name and Signature of Authorized Ace Express Staff Member: