Title Page

  • PROPERTY ADDRESS

  • Site conducted

  • Prepared by

  • Location
  • Conducted on

Units

  • WORK TYPE

Kitchen Work Items

  • Add images to the opening that include door, radiator, window, ceiling, plumbing and CCU

  • Loft insulation top up

  • Core drill 100mm circular hole for tumble dryer

  • Form opening in existing glazed panel to window and ready for install of extractor fan

  • Works to Dinning room which forms part of the kitchen

  • Apply stain block to walls or ceilings in required locations

  • Provide new FD30

  • Provide new Ply door

  • Adjust door or upgrade

  • Fire Boxing up to 3 Sides - To be Certified

  • Apply new plaster skim or artex finish to ceilings

  • Apply new plaster skim to walls

  • Dot&dub plasterboard

  • Apply new plasterboard to walls

  • Apply marine plywood

  • Pvcu window cill

  • Pvcu window trim

  • Renew Radiator including alterations to pipework (any size)

  • New CCU

  • Bonding coat plaster 5mm

  • Form access panel in duct casing - State if fire rated

  • Supply and install extract fan

  • Provide new ceramic wall tiling

  • Other items

Bathroom Work Items

  • Add images to the opening that include door, radiator, window, ceiling, plumbing and CCU

  • Supply and install new electric shower

  • Provide new Ply door

  • Adjust door or upgrade

  • Turning the bath

  • Fire Boxing up to 3 Sides - To be Certified

  • Apply new plaster skim or artex finish to ceilings

  • Apply new plaster skim to walls

  • Dot&dub plasterboard

  • Apply new plasterboard to walls

  • Apply marine plywood

  • Pvcu window cill

  • Pvcu window trim

  • Renew Radiator including alterations to pipework (any size)

  • Bonding coat plaster 5mm

  • Form access panel in duct casing - State if fire rated

  • Supply and install extract fan

  • WHAT IS THE REASON WHY IT HASN`T BEEN INSTALLED?

  • Provide new ceramic wall tiling

  • Other items

Shower Room Work Items

  • Add images to the opening that include door, radiator, window, ceiling, plumbing and CCU

  • Supply and install new electric shower

  • Provide new Ply door

  • Adjust door or upgrade

  • Fire Boxing up to 3 Sides - To be Certified

  • Apply new plaster skim or artex finish to ceilings

  • Apply new plaster skim to walls

  • Dot&dub plasterboard

  • Apply new plasterboard to walls

  • Apply marine plywood

  • Pvcu window cill

  • Pvcu window trim

  • Renew Radiator including alterations to pipework (any size)

  • Bonding coat plaster 5mm

  • Form access panel in duct casing - State if fire rated

  • Supply and install extract fan

  • WHAT IS THE REASON WHY IT HASN`T BEEN INSTALLED?

  • Provide new ceramic wall tiling

  • Other items

Cloakroom Work Items

  • Add images to the opening that include door, radiator, window, ceiling, plumbing and CCU

  • Provide new Ply door

  • Adjust door or upgrade

  • Fire Boxing up to 3 Sides - To be Certified

  • Apply new plaster skim or artex finish to ceilings

  • Apply new plaster skim to walls

  • Dot&dub plasterboard

  • Apply new plasterboard to walls

  • Apply marine plywood

  • Pvcu window cill

  • Pvcu window trim

  • Renew Radiator including alterations to pipework (any size)

  • Bonding coat plaster 5mm

  • Form access panel in duct casing - State if fire rated

  • Supply and install extract fan

  • WHAT IS THE REASON WHY IT HASN`T BEEN INSTALLED?

  • Provide new ceramic wall tiling

  • Other items

WC Work Items

  • Add images to the opening that include door, radiator, window, ceiling, plumbing and CCU

  • Provide new Ply door

  • Adjust door or upgrade

  • Fire Boxing up to 3 Sides - To be Certified

  • Apply new plaster skim or artex finish to ceilings

  • Apply new plaster skim to walls

  • Dot&dub plasterboard

  • Apply new plasterboard to walls

  • Apply marine plywood

  • Pvcu window cill

  • Pvcu window trim

  • Renew Radiator including alterations to pipework (any size)

  • Bonding coat plaster 5mm

  • Form access panel in duct casing - State if fire rated

  • Supply and install extract fan

  • WHAT IS THE REASON WHY IT HASN`T BEEN INSTALLED?

  • Other items

Hand Over

  • Snags

  • BW Representative

  • Date

  • CB Representative

  • Position

CONFIRMATION OF HAND OVER

  • Add images to the HO that include doors, radiators, windows, ceilings, plumbing+gas, CCU.

  • Confirmation on behalf of the subcontractor that the above works have been completed satisfactorily and are a fair reflection of the works undertaken

  • Confirmation on behalf of Chas Berger that the above works have been completed to a satisfactory standard and in line with the subcontractor order documents

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.