Title Page
-
Project
-
Site conducted
-
Block
-
Phase
-
Floor
-
Location
-
Room
-
Drawings
-
Other reference documents
-
Conducted on
-
Prepared by
INSTALLATION
Control points
-
Acceptance Criteria: Installation as per manufacturers recommendations
-
Containment installed as per drawing
-
Containment free from corrosion
-
Bracket positions correct and secure
-
Adequate clearance to other equipment / services
-
Containment size correct
-
Cuts for bends, tees etc deburred and protected against corrosion?
-
Acceptance Criteria: Equipment installation as per manufacturers recommendations
-
containment correctly assembles and rigidly secured to supports
-
Earthing correct to drawings and specification
-
Earthing continuity test results
-
Reviewed by (Name, Signature & Sign Date)