Title Page

  • Project

  • Site conducted

  • Block

  • Phase

  • Floor

  • Location
  • Room

  • Drawings

  • Other reference documents

  • Conducted on

  • Prepared by

INSTALLATION

Control points

  • Paint Finish is satisfactory

  • Correct glands & gland accessories

  • Installed equipment is in correct postion and fixed correctly.

  • Isolator properley installed.

  • Operation

  • Installed & tighten connections to all circuits

  • Phasing identified

  • Earth connection

  • Correctly Sized

  • Supply cable markers installed.

  • Cable cores have markers installed if required.

  • Ensure all cables pass through the same hole to reduce Eddy Currents

  • Ensure Neutral is termianted in the correct neutral terminal

  • Reviewed by (Name, Signature & Sign Date)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.