Title Page
-
Project
-
Site conducted
-
Block
-
Phase
-
Floor
-
Location
-
Room
-
Drawings
-
Other reference documents
-
Conducted on
-
Prepared by
INSTALLATION
Control points
-
Paint Finish is satisfactory
-
Correct glands & gland accessories
-
Installed equipment is in correct postion and fixed correctly.
-
Isolator properley installed.
-
Operation
-
Installed & tighten connections to all circuits
-
Phasing identified
-
Earth connection
-
Correctly Sized
-
Supply cable markers installed.
-
Cable cores have markers installed if required.
-
Ensure all cables pass through the same hole to reduce Eddy Currents
-
Ensure Neutral is termianted in the correct neutral terminal
-
Reviewed by (Name, Signature & Sign Date)