Title Page
-
Project
-
BYUK Representatives
-
EIC
-
Other
-
S/C Representatives (Drayton Beaumont Services)
-
Site Foreman
-
Other
-
Site
-
Phase
-
Block
-
Zone
-
Floor
-
Room(s)
-
Grid line(s)
-
Drawings
-
Other reference documents - Specs: MLM Specification (Traditional Scheme)
-
RA:
-
MS:
-
ITAP:
-
Conducted on
-
Location
Control points
Duct assembly
-
Jointing - Method of joining as per speci'fitions & manufacturers recommandations - Sic Foreman - 100%
-
Material & type - Material as specified, flexible connections for & similar material or ductofan connections - SIC Foreman - 100%
Hangers & supports
-
Rungs - Fixings as specified attached to structural frame members only - SiC Foreman - 100%
-
Spacing of supports - Both side of the ducting as per specifications & manufacturers recomrnandatfons - SPE Foreman - 100%
-
Clearance - Coordination with ceiling , partitioning and other interlacing trades to avoid Dositionino clashes - SiC Foreman - 100%
Flexible connections
-
Used when connecting dissimilar material arid for all connections with eduiciments - S/C Foreman - 100%
Sealing Ductwork
-
As per specifications & manufacturers recommandations - S/C Foreman - 100%
Identification a. labelling
-
Identification & labelling WIR completed - S/C Foreman - 100%
Testing & commissioning
-
Test cetificates submitted - Test results output as per requirements - S/C Foreman - 100%
-
T&C repOrt + Operability notice - Test results output as per requirements - S/C Foreman - 100%
HOLD POINT
-
T&C cerlfrficate submitted - BYLIK EIC - 100%
-
Add signature
Witnessed by (For the S/C)
-
Name, Signature & Sign Date
-
Observations
-
Distribution
Witnessed by (For BYUK Production)
-
Name, Signature & Sign Date
-
Observations
-
Distribution
Witnessed by (Others)
-
Name, Signature & Sign Date
-
Observations
-
Distribution